Halloween Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: merry71

Free LEED Green Associate GAFRE Exam (LEED GA) Practice Questions

Question # 81

Rainwater Management is a credit in which LEED v4 category?

Options:

A.  

Water Efficiency

B.  

Sustainable Sites

C.  

Energy and Atmosphere

D.  

Location and Transportation

Discussion 0
Question # 82

Which of the following negative impacts on the environment are a result of waste being transported/diverted to landfills?

Options:

A.  

Increased pre-consumer recycled content

B.  

Decreased post-consumer recycled content

C.  

Waste is incinerated and used to generate energy

D.  

Solid waste produces methane and potent greenhouse gas

Discussion 0
Question # 83

Acoustic Performance falls under which credit category?

Options:

A.  

Sustainable Sites

B.  

Energy and Atmosphere

C.  

Materials and Resources

D.  

Indoor Environmental Quality

Discussion 0
Question # 84

Which of the following LEED credit categories addresses conditions within a building and their effects on occupants?

Options:

A.  

Indoor Energy Quality

B.  

Indoor Environmental Quality

C.  

Indoor Efficiency Quality

D.  

Indoor Air Quality

Discussion 0
Question # 85

To attain the Integrative Process Credit, a project team must identify

Options:

A.  

synergies between systems

B.  

tenant design and construction guidelines

C.  

community outreach strategies

D.  

order of phase completion

Discussion 0
Question # 86

A project plans to build a campus of buildings. Which of the following strategies should the project team consider to reduce energy demand?

Options:

A.  

Purchase carbon offsets

B.  

Design buildings to shade each other

C.  

Enroll in a demand response program

D.  

Select HVAC equipment without refrigerants

Discussion 0
Question # 87

What plumbing fixture eliminates water use?

Options:

A.  

Dual-flush toilet

B.  

Low-flow lavatory

C.  

WaterSense-labeled toilet

D.  

Composting toilet

Discussion 0
Question # 88

A new office building project is aiming for LEED certification. The project team wants to ensure that the building accommodates diverse occupant needs and promotes a healthy social environment. Which design strategy should the project team implement to fulfill universal accessibility requirements and align with LEED concepts and requirements?

Options:

A.  

Incorporate fixed-height workstations

B.  

Install doors that open with a hand wave

C.  

Create outdoor social gathering spaces

D.  

Reduce accessible entrances to one location

Discussion 0
Question # 89

According to LEE

D.  

which of the following should be considered when locating a site for a project?

Options:

A.  

Political landscape

B.  

Infrastructure context

C.  

Economic stability

D.  

Revenue generating possibilities

Discussion 0
Question # 90

When instituting a construction waste management plan, which of the following should be tracked?

Options:

A.  

Number Of dumpsters used

B.  

Volume/weight of materials diverted

C.  

Amount of site soils reused on the site

D.  

Amount of post-consumer recycled content

Discussion 0

LEED-Green-Associate PDF

LEED-Green-Associate PDF (Printable)
$46.5
$154.99

LEED-Green-Associate Testing Engine

LEED-Green-Associate PDF (Printable)
$51
$169.99

LEED-Green-Associate PDF + Testing Engine

LEED-Green-Associate PDF (Printable)
$63.9
$212.99

Free Exams Sample Questions