Start with our free LEED-Green-Associate practice questions, carefully crafted to mirror the domains, phrasing, and difficulty of the real Leadership in Energy and Environmental Design (LEED) exam. Each LEED-Green-Associate exam question comes with a detailed rationale that explains not just which answer is correct but why the others fall short. That's how concepts stick. Use the free set to benchmark yourself: identify your USGBC weak domains, see where you're losing marks, and build a focused study plan in minutes.

LEED-Green-Associate PDF

LEED-Green-Associate PDF (Printable)
$54.25
$154.99

LEED-Green-Associate Testing Engine

LEED-Green-Associate PDF (Printable)
$59.5
$169.99

LEED-Green-Associate PDF + Testing Engine

LEED-Green-Associate PDF (Printable)
$74.55
$212.99
Question # 111

Which of the following third-party verification strategy contributes to environmentally preferable products?

Options:

A.  

ASHRAE 90.1

B.  

California ' s Title 24

C.  

Green Buying Council

D.  

Forest Stewardship Council

Discussion 0
Question # 112

Volatile Organic Compounds (VOCs) are chemicals that do which of the following?

Options:

A.  

Can evaporate at normal indoor temperatures and pressures

B.  

Need high pressures and high temperatures to evaporate

C.  

Come directly only from the earth’s soil

D.  

Are always harmless in occupied buildings

Discussion 0
Question # 113

Which of the following is a source of graywater?

Options:

A.  

Toilets

B.  

Urinals

C.  

Sprinklers

D.  

Lavatory faucets

Discussion 0
Question # 114

Which process evaluates the environmental impact of a building project by considering factors from raw material extraction to disposal?

Options:

A.  

Environmental Product Declaration

B.  

Sustainable Sites planning

C.  

Life-cycle assessment

D.  

Life-cycle costing

Discussion 0
Question # 115

Which of the following sites is most appropriate to encourage a walkable street design?

Options:

A.  

A neighborhood that includes a diversity of use

B.  

An area with a decreased building-height-to-street-width ratio

C.  

A development that uses many culs-de-sac in the street design

D.  

A project in an area designed with streets to facilitate increased speed limits

Discussion 0
Question # 116

Which describes the difference between graywater and blackwater?

Options:

A.  

Graywater includes storm water and potable water, whereas blackwater Includes stormwater and Irrigation

B.  

Graywater may be used for irrigation or drinking, but blackwater should only be used as a source of process water

C.  

Graywater includes wastewater from lavatory faucets, whereas blackwater includes waste water from toilets and urinals

D.  

Graywater is approved for human consumption and may be supplied from wells or municipal water systems, whereas blackwater is comprised of wastewater from toilets and urinals

Discussion 0
Question # 117

Which of the following techniques IS recommended for preventing the negative effects of indoor pollutants?

Options:

A.  

Deep cleaning all surfaces during occupant move-in

B.  

Keeping material containers open during construction

C.  

Specifying and installing low-emitting materials at the source

D.  

Keeping doors and windows open after installation of interior finishes

Discussion 0
Question # 118

What is the purpose of the LEED rating system?

Options:

A.  

To promote a worldwide certification standard only for industrial buildings

B.  

To provide a framework for healthy, efficient, and cost-saving green buildings

C.  

To establish a set of financial incentives for building green

D.  

To replace all local building codes and zoning ordinances

Discussion 0
Question # 119

When a developer builds a new shopping center in a rural area, one externality might be

Options:

A.  

an increase in profits for the developer

B.  

an increase in traffic on adjacent roads

C.  

an increase in installation of rooftop solar

D.  

an increase in the fees for customer parking

Discussion 0
Question # 120

The amount of landfill-destined waste generated during project construction can be reduced by requiring the general contractor to

Options:

A.  

burn paper and cardboard materials on-site

B.  

use contractor vehicles to disperse waste materials to multiple disposal sites within the project region

C.  

follow requirements for using dimensional construction materials, prefabrication or material efficient framing

D.  

take advantage of municipal waste pick-up to reduce the weight of the project ' s construction material scraps