Summer Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

LEED-Green-Associate LEED Green Associate GAFRE Exam (LEED GA) is now Stable and With Pass Result | Test Your Knowledge for Free

Exams4sure Dumps

LEED-Green-Associate Practice Questions

LEED Green Associate GAFRE Exam (LEED GA)

Last Update 3 days ago
Total Questions : 430

Dive into our fully updated and stable LEED-Green-Associate practice test platform, featuring all the latest Leadership in Energy and Environmental Design (LEED) exam questions added this week. Our preparation tool is more than just a USGBC study aid; it's a strategic advantage.

Our free Leadership in Energy and Environmental Design (LEED) practice questions crafted to reflect the domains and difficulty of the actual exam. The detailed rationales explain the 'why' behind each answer, reinforcing key concepts about LEED-Green-Associate. Use this test to pinpoint which areas you need to focus your study on.

LEED-Green-Associate PDF

LEED-Green-Associate PDF (Printable)
$54.25
$154.99

LEED-Green-Associate Testing Engine

LEED-Green-Associate PDF (Printable)
$59.5
$169.99

LEED-Green-Associate PDF + Testing Engine

LEED-Green-Associate PDF (Printable)
$74.55
$212.99
Question # 111

Which of the following third-party verification strategy contributes to environmentally preferable products?

Options:

A.  

ASHRAE 90.1

B.  

California ' s Title 24

C.  

Green Buying Council

D.  

Forest Stewardship Council

Discussion 0
Question # 112

Volatile Organic Compounds (VOCs) are chemicals that do which of the following?

Options:

A.  

Can evaporate at normal indoor temperatures and pressures

B.  

Need high pressures and high temperatures to evaporate

C.  

Come directly only from the earth’s soil

D.  

Are always harmless in occupied buildings

Discussion 0
Question # 113

Which of the following is a source of graywater?

Options:

A.  

Toilets

B.  

Urinals

C.  

Sprinklers

D.  

Lavatory faucets

Discussion 0
Question # 114

Which process evaluates the environmental impact of a building project by considering factors from raw material extraction to disposal?

Options:

A.  

Environmental Product Declaration

B.  

Sustainable Sites planning

C.  

Life-cycle assessment

D.  

Life-cycle costing

Discussion 0
Question # 115

Which of the following sites is most appropriate to encourage a walkable street design?

Options:

A.  

A neighborhood that includes a diversity of use

B.  

An area with a decreased building-height-to-street-width ratio

C.  

A development that uses many culs-de-sac in the street design

D.  

A project in an area designed with streets to facilitate increased speed limits

Discussion 0
Question # 116

Which describes the difference between graywater and blackwater?

Options:

A.  

Graywater includes storm water and potable water, whereas blackwater Includes stormwater and Irrigation

B.  

Graywater may be used for irrigation or drinking, but blackwater should only be used as a source of process water

C.  

Graywater includes wastewater from lavatory faucets, whereas blackwater includes waste water from toilets and urinals

D.  

Graywater is approved for human consumption and may be supplied from wells or municipal water systems, whereas blackwater is comprised of wastewater from toilets and urinals

Discussion 0
Question # 117

Which of the following techniques IS recommended for preventing the negative effects of indoor pollutants?

Options:

A.  

Deep cleaning all surfaces during occupant move-in

B.  

Keeping material containers open during construction

C.  

Specifying and installing low-emitting materials at the source

D.  

Keeping doors and windows open after installation of interior finishes

Discussion 0
Question # 118

What is the purpose of the LEED rating system?

Options:

A.  

To promote a worldwide certification standard only for industrial buildings

B.  

To provide a framework for healthy, efficient, and cost-saving green buildings

C.  

To establish a set of financial incentives for building green

D.  

To replace all local building codes and zoning ordinances

Discussion 0
Question # 119

When a developer builds a new shopping center in a rural area, one externality might be

Options:

A.  

an increase in profits for the developer

B.  

an increase in traffic on adjacent roads

C.  

an increase in installation of rooftop solar

D.  

an increase in the fees for customer parking

Discussion 0
Question # 120

The amount of landfill-destined waste generated during project construction can be reduced by requiring the general contractor to

Options:

A.  

burn paper and cardboard materials on-site

B.  

use contractor vehicles to disperse waste materials to multiple disposal sites within the project region

C.  

follow requirements for using dimensional construction materials, prefabrication or material efficient framing

D.  

take advantage of municipal waste pick-up to reduce the weight of the project ' s construction material scraps

Discussion 0
Get LEED-Green-Associate dumps and pass your exam in 24 hours!

Free Exams Sample Questions