Pre-Summer Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

RCDDv14.1 BICSI Registered Communications Distribution Designer – RCDDv14.1 is now Stable and With Pass Result | Test Your Knowledge for Free

Exams4sure Dumps

RCDDv14.1 Practice Questions

BICSI Registered Communications Distribution Designer – RCDDv14.1

Last Update 1 day ago
Total Questions : 320

Dive into our fully updated and stable RCDDv14.1 practice test platform, featuring all the latest RCDD exam questions added this week. Our preparation tool is more than just a BICSI study aid; it's a strategic advantage.

Our free RCDD practice questions crafted to reflect the domains and difficulty of the actual exam. The detailed rationales explain the 'why' behind each answer, reinforcing key concepts about RCDDv14.1. Use this test to pinpoint which areas you need to focus your study on.

RCDDv14.1 PDF

RCDDv14.1 PDF (Printable)
$54.25
$154.99

RCDDv14.1 Testing Engine

RCDDv14.1 PDF (Printable)
$59.5
$169.99

RCDDv14.1 PDF + Testing Engine

RCDDv14.1 PDF (Printable)
$74.55
$212.99
Question # 31

Which of the following team members is responsible for ensuring compliance with me contract documents (CD)?

Options:

A.  

Owner

B.  

lCT Distribution Designer

C.  

Architect

D.  

Construction Manager (CM)

Discussion 0
Question # 32

A program will generate revenue for several years after it ends. The program manager and the operations manager, who are accountable for managing the benefits after program closure, are in disagreement. The operations manager is concerned that information necessary for managing the processes and benefits after program closure will be unavailable. The program manager expresses that managing the benefits after program closure is not within the scope and must be managed through the scope management plan.

What should the program sponsor do?

Options:

A.  

Direct the operations manager to allocate a resource to the program to ensure that knowledge transfer and process development occur before closure

B.  

Direct the operations manager to allocate the necessary resources to establish proper plans for accepting the benefits and processes after program closure.

C.  

Direct the program manager to develop the necessary plans to ensure benefits can be transitioned and sustained after program closure.

D.  

Direct the program manager to assess the impact of this change and follow the established change management process

Discussion 0
Question # 33

Which two of the following components are included in a backbone distribution system (BDS)? (Choose two.)

Options:

A.  

Work area outlets

B.  

Telecommunications enclosures

C.  

Equipment Cord

D.  

Equipment rooms

E.  

Horizontal Cable

Discussion 0
Question # 34

Component project managers create project management plans for all component projects in a program. The program manager notices that some project managers prefer one status report template while others prefer another

How should the program manager decide which template is appropriate?

Options:

A.  

Review the issue with the program management office (PMO) to determine which template to use

B.  

Review the issue with the project managers and come to mutual agreement on which template to use

C.  

Meet with the program governance board to select an appropriate template

D.  

Allow the component project managers to use their preferred templates

Discussion 0
Question # 35

You are designing distribution for a seven unit townhouse with in slab conduits. What is the MINIMUM number of 27 mm (1 in) rigid PVC Type 2 or metallic conduit that is required to satisfy distribution to each unit?

Options:

A.  

Three

B.  

Four

C.  

Five

D.  

Seven

E.  

Fourteen

Discussion 0
Question # 36

What is the FIRST step in quality evolution (focused on physical quality) when developing a quality plan?

Options:

A.  

Qualitative risk analysis

B.  

Client satisfaction

C.  

Conformance

D.  

Client value

E.  

Quantitative risk analysis

Discussion 0
Question # 37

What is the MAXIMUM length of continuous conduit allowed before a pull point or pull box needs to be installed?

Options:

A.  

≈15.20 m (50 ft)

B.  

≈22.90 m (75 ft)

C.  

≈30.50 m (100 ft)

D.  

≈45.70 m (150 ft)

Discussion 0
Question # 38

When responding to a submittal that has been rejected and/or has comments written by a reviewer, the ICT distribution designer may need to perform which two of the following actions? (Select two options.)

Options:

A.  

Request a Change Order from the client for the extra work performed.

B.  

Document the reviewer's status and/or comments

C.  

Review the contract requirements and revise the submittal to comply with these requirements

D.  

Request a variance from the contract requirements from the client.

E.  

Submit an alternate product in lieu of one that was previously submitted, even if it does not meet all of the contract requirements

Discussion 0
Question # 39

Which of the following is TRUE for tele communications spaces?

Options:

A.  

Maintain aim (3.28 ft) clearance between equipment and plumbing fixtures such as mop sinks

B.  

Plumbing piping not related to the support of the space should not pass through the space.

C.  

Relative humidity snail be maintained at 40% ± 5%.

D.  

Close proximity to water service is desired so consider locating the ER in the pipe chase.

Discussion 0
Question # 40

An RFQ usually provides more detail than RFP in selection material such as

Options:

A.  

delivery date

B.  

color

C.  

make

D.  

mounting option

Discussion 0