CFM Practice Questions

Certified Facility Manager

Last Update 1 day ago
Total Questions : 257

Dive into our fully updated and stable CFM practice test platform, featuring all the latest Facility Manager exam questions added this week. Our preparation tool is more than just a IFMA study aid; it's a strategic advantage.

Our free Facility Manager practice questions crafted to reflect the domains and difficulty of the actual exam. The detailed rationales explain the 'why' behind each answer, reinforcing key concepts about CFM. Use this test to pinpoint which areas you need to focus your study on.

CFM PDF

CFM PDF (Printable)
$43.75
$124.99

CFM Testing Engine

CFM PDF (Printable)
$50.75
$144.99

CFM PDF + Testing Engine

CFM PDF (Printable)
$63.7
$181.99
Question # 11

Your organization is considering relocating from leased building #1 into leased building #2. Leased building #1 is 55,000 sq. ft. costing $1,100,000 annually. Leased building #2 is 50,000 sq. ft. costing $1,100,000 annually. Building #1 can house 500 people and building #2 can house 580 people. Your company's benchmark is $2,000.00 per person per year for leased space. Which building has a lower cost per sq. ft.?

Options:

A.  

Building #1 has a lower cost per sq. ft.

B.  

Building #1 and Building #2 are the same cost per sq. ft.

C.  

Building #1 has a lower cost per person.

D.  

Building #2 has a lower cost per sq. ft.

Discussion 0
Question # 12

What should be considered when developing a strategic facility management plan?

Options:

A.  

The demand organization’s business plan.

B.  

Reducing facility management cost.

C.  

Obtaining a larger facility management budget.

Discussion 0
Question # 13

What is the most common method to accelerate the completion of a project?

Options:

A.  

Outsourcing project work

B.  

Reducing scope

C.  

Adding resources

D.  

Scheduling overtime

Discussion 0
Question # 14

What approach best promotes indoor environmental quality and health?

Options:

A.  

The maintenance and monitoring of acceptable levels of ambiance, safety, lighting, and environmental wellness.

B.  

The strategies and systems used to provide occupants with a healthy, productive, comfortable, and safe workplace.

C.  

The measurement and monitoring of hazardous conditions that pose threats to health, the environment, and the quality of life.

Discussion 0
Question # 15

How can you prevent power issues in a training room dependent on Power over Ethernet (PoE) switches?

Options:

A.  

Load shedding

B.  

Redundant power over Ethernet switches

C.  

Uninterruptible power supply

D.  

Capacity management

Discussion 0
Question # 16

What defines the building envelope?

Options:

A.  

Stairways and vertical penetrations.

B.  

Exterior walls, roof, windows, and doors.

C.  

Corridors and circulation spaces.

D.  

Electrical and mechanical areas.

Discussion 0
Question # 17

You are the Facility Manager leading a project to integrate two office groups. You will need a unifying message that guides your communications and decision-making when working with a variety of consultants, senior management, and the affected groups. What is your unifying message?

Options:

A.  

How the project benefits and contributes to the success of the organization.

B.  

The needs of the executives who own the project and how they want things done.

C.  

How long the project is expected to take, what it will cost, and key parties involved.

D.  

Who will be impacted by the project and how their work lives will be improved.

Discussion 0
Question # 18

What is an industry standard quality program?

Options:

A.  

Computerized Maintenance Management Reports

B.  

Facility Management Benchmarks

C.  

Six Sigma

D.  

Certified Maintenance and Reliability Reports

Discussion 0
Question # 19

When designing buildings and considering airflow, which location would be the most appropriate place for air intake?

Options:

A.  

Air intake comes from the parking lot because the air here is fresh from 7 PM to 7 AM when cars are not driving into the area or parking.

B.  

Air intake comes from around the mechanicals because air here has been heated by exhausts from mechanicals.

C.  

Air intake comes from the highway where there is always fresh air available.

D.  

Air intake comes from the roof level of the side of the building facing a green area between buildings because the air here is free from external pollutants.

Discussion 0
Question # 20

What mechanism should be used to evaluate the work of an outsourced property management contract?

Options:

A.  

Create a checklist in the scope of work.

B.  

Describe the expected performance of the contract.

C.  

Clearly identify Key Performance Indicators.

D.  

Research Best Practices for outsourcing.

Discussion 0