Spring Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

CFM Certified Facility Manager is now Stable and With Pass Result | Test Your Knowledge for Free

Exams4sure Dumps

CFM Practice Questions

Certified Facility Manager

Last Update 1 day ago
Total Questions : 257

Dive into our fully updated and stable CFM practice test platform, featuring all the latest Facility Manager exam questions added this week. Our preparation tool is more than just a IFMA study aid; it's a strategic advantage.

Our free Facility Manager practice questions crafted to reflect the domains and difficulty of the actual exam. The detailed rationales explain the 'why' behind each answer, reinforcing key concepts about CFM. Use this test to pinpoint which areas you need to focus your study on.

CFM PDF

CFM PDF (Printable)
$43.75
$124.99

CFM Testing Engine

CFM PDF (Printable)
$50.75
$144.99

CFM PDF + Testing Engine

CFM PDF (Printable)
$63.7
$181.99
Question # 61

A facility manager wants to implement a centralized work request center for facility requests. After market research, the facility manager finds several different ways to prioritize requests. Which criteria should be used to prioritize work requests?

Options:

A.  

Job classification, total cost, complexity.

B.  

Criticality, safety, complexity.

C.  

Criticality, total cost, completion time.

D.  

Criticality, material cost, complexity.

Discussion 0
Question # 62

What is the BEST course of action for a facility manager to take when an engineer continues to lag behind other engineers in productivity?

Options:

A.  

Use the engineer as an example of how not to perform to other engineers.

B.  

Report the engineer to Human Resources.

C.  

Develop a performance improvement plan with the engineer.

D.  

Give the engineer a chance to correct his deficiencies on his own.

Discussion 0
Question # 63

What should Key Performance Indicators (KPIs) for a project primarily focus on?

Options:

A.  

Total project cost.

B.  

Critical success factors.

C.  

On-time delivery.

Discussion 0
Question # 64

A chargeback system for electrical power use is being proposed as a means to encourage reduced consumption and to lower utility costs. What approach might be MOST equitable in attaining this goal?

Options:

A.  

Charge departments based on net area occupied.

B.  

Negotiate the individual chargeback rate with each department.

C.  

Charge departments for their equipment based on their headcount as a percentage of total site headcount.

D.  

Install sub-meters for each department as a basis for chargeback.

Discussion 0
Question # 65

What is the information gained from a risk assessment, business impact analysis, and a resource needs assessment used for?

Options:

A.  

Business workflow plans.

B.  

Property inspection and insurance assessments.

C.  

Continuity and recovery plans.

D.  

Risk management analyses.

Discussion 0
Question # 66

A company has decided to establish a long-range strategic facility technology plan. What is the first step in determining the future technology needs of the company?

Options:

A.  

Determine the level of employee technological skill requirements for the future.

B.  

Review corporate plans for building renovations and lease negotiations.

C.  

Research advances in technology.

D.  

Conduct an assessment of existing technology.

Discussion 0
Question # 67

What activity would increase a facility's carbon footprint?

Options:

A.  

Replacing filters in the air handlers

B.  

Extending the occupancy hours

C.  

Replacing the existing system with high-efficiency equipment

Discussion 0
Question # 68

How can facilities management improve the sustainability of the building envelope?

Options:

A.  

Scheduling quarterly inspection of building exterior for structural defects

B.  

Increasing efficiency of the central air conditioning chiller plant

C.  

Ignore maintenance of the exterior surfaces subject to degradation

D.  

Removing shading devices

Discussion 0
Question # 69

How is the Facility Condition Index (FCI) determined?

Options:

A.  

Dividing the cost of deficiencies by the facility replacement value.

B.  

Subtracting the facility replacement value by the cost of deficiencies.

C.  

Dividing the facility replacement value by the cost of deficiencies.

D.  

Multiplying the cost of deficiencies by the facility replacement value.

Discussion 0
Question # 70

What is the BEST strategy to reduce waste in an organization?

Options:

A.  

Reuse.

B.  

Prevention.

C.  

Recycling.

D.  

Composting.