Exclusive Black Friday Deal: 70% Off All Exam Bundles! Use coupon code below to unlock your savings! - Ends in 0d 00h 00m 00s - Coupon code: Friday70

Free Certified Six Sigma Black Belt Practice Questions

Question # 41

Displayed performance indicators is an example of

Options:

A.  

control plans

B.  

visual controls

C.  

reliability-based maintenance

D.  

a kanban system

Discussion 0
Question # 42

If xₘ equals the measured value and x equals the true value, which of the following equations should be used to calculate measurement system bias?

Options:

A.  

xₘ / x

B.  

xₘ − x

C.  

(xₘ − x) / x

D.  

|xₘ − x|

Discussion 0
Question # 43

Self-directed learning (SDL), coaching, case studies, on-the-job training (OJT), simulations, distance learning, job aids, remote learning, discussion format, lectures, and presentations are methods for

Options:

Discussion 0
Question # 44

Which of the following tools begins at the point of failure and works back through the process to the components?

Options:

A.  

Fault tree analysis

B.  

Pugh matrix

C.  

Cause and effect matrix

D.  

Kappa analysis

Discussion 0
Question # 45

As DMAIC projects are rolled out to process owners and staff, training needs to focus on

Options:

A.  

obtaining top management support

B.  

giving instruction on how to plan, administer, and control the work to top management

C.  

motivating the staff to higher productivity and quality

D.  

providing process owners and staff instructions on planning, doing, and controlling the process

Discussion 0
Question # 46

A company that is selecting a Six Sigma project from four potential projects should select the one that

Options:

A.  

focuses on the area with the highest DPMO

B.  

will reduce the overall cost of quality

C.  

offers the highest production yield

D.  

is aligned with the company’s strategic goals

Discussion 0
Question # 47

Which of the following benefits can be realized directly from a complete, well-defined process map?

Options:

A.  

Quantitative analysis of the process input and output variables

B.  

Development of an attributes control chart

C.  

Development of a variables control chart

D.  

Insight into the process that is not otherwise apparent

Discussion 0
Question # 48

A process decision program chart (PDPC) can be used to develop a

Options:

A.  

project schedule

B.  

cause and effect matrix

C.  

tree diagram

D.  

contingency plan

Discussion 0
Question # 49

Which of the following analytical tools identifies the events that can go wrong, and the appropriate countermeasures for those events?

Options:

A.  

Process decision program chart

B.  

Prioritization matrix

C.  

Interrelationship digraph

D.  

Activity network diagram

Discussion 0
Question # 50

In order for a Six Sigma project team to evaluate progress on its goals and objectives, which of the following conditions must be met?

Options:

A.  

The team should develop the evaluation criteria during the Measure phase of the project.

B.  

The team should agree on the evaluation criteria as part of the start of the project.

C.  

The team members should submit narrative evaluations regarding their individual performance at prescribed intervals throughout the project.

D.  

The facilitator should establish the team’s goals and objectives at the first meeting.

Discussion 0

CSSBB PDF

CSSBB PDF (Printable)
$46.5
$154.99

CSSBB Testing Engine

CSSBB PDF (Printable)
$51
$169.99

CSSBB PDF + Testing Engine

CSSBB PDF (Printable)
$63.9
$212.99

Free Exams Sample Questions