Question # 51

Which of the following terms describes risk associated with raw material pricing within a monthly budget cycle?

Options:

A.  

Volatility

B.  

Uncertainty

C.  

Complexity

D.  

Ambiguity

Discussion 0
Question # 52

Which of the following symbols is used to denote a sample standard deviation?

Options:

A.  

ρ

B.  

μ

C.  

σ

D.  

s

Discussion 0
Question # 53

In the factorial design main-effects plot shown, which factor setting gives the lower response?

Options:

A.  

Factor A high

B.  

Factor A low

C.  

Factor B high

D.  

Factor B low

Discussion 0
Question # 54

Two catalysts are being analyzed to compare their effect on the yield of a chemical process. Catalyst 1 is currently being used, and catalyst 2 is being considered as it is a less expensive alternative, provided the yield is the same. An experiment is run with 10 observations for each catalyst and t = -1.06. Assuming equal variances and α = 0.05, which of the following conclusions can be made?

Options:

A.  

t0.025,18 = -2.101 < -1.06 < 2.101, and yields are different

B.  

t0.025,18 = -2.101 < -1.06 < 2.101, and yields are not different

C.  

t0.05,18 = -1.734 < -1.06 < 1.734, and yields are different

D.  

t0.05,18 = -1.734 < -1.06 < 1.734, and yields are not different

Discussion 0
Question # 55

Drum-buffer-rope refers to which step in the Theory of Constraints?

Options:

A.  

Identify

B.  

Exploit

C.  

Subordinate

D.  

Elevate

Discussion 0
Question # 56

Please refer to the following line balance chart.

Question # 56

The work content of Station 3 is what percentage of takt time?

Options:

A.  

33%

B.  

50%

C.  

67%

D.  

100%

Discussion 0
Question # 57

Who is responsible for holding team members accountable for completing their assigned tasks?

Options:

A.  

Sponsor

B.  

Facilitator

C.  

Team leader

D.  

Coach

Discussion 0
Question # 58

Which of the following factors should be considered while prioritizing Six Sigma projects?

Options:

A.  

Resources required and project length

B.  

Master Black Belt preference and the impact on customers

C.  

Project’s value to the business and resources required

D.  

Project’s value to the business and Black Belt’s preference

Discussion 0
Question # 59

The gains made as the result of an improvement process can best be maintained by taking which of the following actions?

Options:

A.  

Aligning the project results with the organizational goals and objectives

B.  

Adjusting budgets to reflect improvements from the project

C.  

Modifying procedures to reflect the changes in the revised process

D.  

Providing senior leaders with information about the implementation plan

Discussion 0
Question # 60

If a Six Sigma Black Belt estimates that investing $200,000 in a project will result in a savings of $700,000, what is the project’s return on investment (ROI)?

Options:

A.  

0.28

B.  

0.35

C.  

2.50

D.  

5.00

Discussion 0

CSSBB PDF

CSSBB PDF (Printable)
$46.5
$154.99

CSSBB Testing Engine

CSSBB PDF (Printable)
$51
$169.99

CSSBB PDF + Testing Engine

CSSBB PDF (Printable)
$63.9
$212.99

Free Exams Sample Questions