CPIM-ECO Practice Exam Questions and Answers

Execution and Control of Operations

Last Update 5 days ago
Total Questions : 105

Execution and Control of Operations is stable now with all latest exam questions are added 5 days ago. Incorporating CPIM-ECO practice exam questions into your study plan is more than just a preparation strategy.

By familiarizing yourself with the Execution and Control of Operations exam format, identifying knowledge gaps, applying theoretical knowledge in APICS practical scenarios, you are setting yourself up for success. CPIM-ECO exam dumps provide a realistic preview, helping you to adapt your preparation strategy accordingly.

CPIM-ECO exam questions often include scenarios and problem-solving exercises that mirror real-world challenges. Working through CPIM-ECO dumps allows you to practice pacing yourself, ensuring that you can complete all Execution and Control of Operations exam questions within the allotted time frame without sacrificing accuracy.

CPIM-ECO PDF

CPIM-ECO PDF (Printable)
$48
$119.99

CPIM-ECO Testing Engine

CPIM-ECO PDF (Printable)
$56
$139.99

CPIM-ECO PDF + Testing Engine

CPIM-ECO PDF (Printable)
$70.8
$176.99
Question # 1

Which of the following steps should be first in determining operation start dates for capacity planning?

Options:

A.  

Input/output control

B.  

Forward or backward scheduling

C.  

Finite or infinite loading

D.  

Order preparation and release

Discussion 0
Question # 2

Which of the following outcomes is typical of employee engagement?

Options:

A.  

Discretionary effort exerted towards improvement in quality

B.  

Increase debate about company goals

C.  

Decrease in hoshin planning activities

D.  

Increase in kanban size of in-process inventories

Discussion 0
Question # 3

Mixed-model scheduling results in which of the following benefits:

Options:

A.  

Improved efficiency

B.  

Less headcount required

C.  

Lower finished goods inventory

D.  

Increased forecast accuracy

Discussion 0
Question # 4

Which of the following applications is an effective use of electronic data interchange?

Options:

A.  

Routing

B.  

Price increase

C.  

Advance shipment notice

D.  

Returned material authorization

Discussion 0
Question # 5

A production manager uses a hoshin plan to communicate:

Options:

A.  

financial status.

B.  

operational issues.

C.  

new ideas.

D.  

strategy.

Discussion 0
Question # 6

Which of the following benefits is a result of Standardized Work?

Options:

A.  

Ergonomic repetitive movements

B.  

Reduced quality checks

C.  

Evolutionary operations

D.  

Process stability

Discussion 0
Question # 7

In process improvement, which of the following procedures should be done first?

Options:

A.  

Assess employee productivity.

B.  

Analyze process variances.

C.  

Identify process steps.

D.  

Establish priorities for process change.

Discussion 0
Question # 8

A kanban shop floor control system has which of the following characteristics?

Options:

A.  

Large lot sizes

B.  

Fixed routings

C.  

Fixed worker assignments

D.  

Forward scheduling

Discussion 0
Question # 9

In an attempt to reduce costs associated with information system transactions, which of the following approaches should be considered?

Options:

A.  

Discontinue backflushing components

B.  

Reducing levels in the bill of material

C.  

Remove the component supermarket

D.  

Reducing lot sizes of manufactured products

Discussion 0
Question # 10

A work center has one machine that is operated for one shift per day. The shop runs an 8-hour shift 5 days per week. Machine utilization has been 60% with efficiency at 80%. A routing through this work center has a standard run time of .10 hours per piece. Job number 1234 is for 200 pieces. If the utilization is improved to 80%, the difference in calculated lead time for the job is how many days?

Options:

A.  

1.0

B.  

1.3

C.  

2.1

D.  

2.7

Discussion 0
Question # 11

The actual output of a work center for a given time period can be determined by evaluating the:

Options:

A.  

number of standard hours in the queue.

B.  

number of standard hours per units produced.

C.  

number of machine hours.

D.  

amount of rated capacity less rework.

Discussion 0
Question # 12

The question below is based on the following information:

{exhibit 1528}

What is the available capacity in hours for a 20-workday month?

Options:

A.  

160

B.  

180

C.  

240

D.  

320

Discussion 0
Question # 13

The best way to determine feasibility of the capacity plan for a work center is to use:

Options:

A.  

input/output control.

B.  

priority sequencing rules.

C.  

order management processing.

D.  

rough-cut capacity planning.

Discussion 0
Question # 14

Based on the theory of constraints (TOC) scheduling approach, smaller lots created as a result of splitting order quantities are considered to be:

Options:

A.  

period order quantities.

B.  

bottleneck batches.

C.  

transfer batches.

D.  

campaign orders.

Discussion 0
Question # 15

The utilization of a downstream nonbottleneck resource is determined by:

Options:

A.  

a bottleneck resource.

B.  

theoretical capacity.

C.  

available capacity.

D.  

standard hours available.

Discussion 0