Labour Day Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 2493360325

Good News !!! DES-6322 Specialist - Implementation Engineer-VxRail Exam is now Stable and With Pass Result

DES-6322 Practice Exam Questions and Answers

Specialist - Implementation Engineer-VxRail Exam

Last Update 5 days ago
Total Questions : 105

DES-6322 is stable now with all latest exam questions are added 5 days ago. Just download our Full package and start your journey with EMC Specialist - Implementation Engineer-VxRail Exam certification. All these EMC DES-6322 practice exam questions are real and verified by our Experts in the related industry fields.

DES-6322 PDF

DES-6322 PDF (Printable)
$48
$119.99

DES-6322 Testing Engine

DES-6322 PDF (Printable)
$56
$139.99

DES-6322 PDF + Testing Engine

DES-6322 PDF (Printable)
$70.8
$176.99
Question # 1

A systems engineer is tasked to configure a VxRail cluster and notices that the VxRail Deployment Wizard fails to launch. The engineer discovers that the software is corrupted.

What should the engineer do to address the issue?

Options:

A.  

Use the VMware Host Client and iDRAC to access the nodes for troubleshooting

B.  

Verify that the JSON file is not corrupted and has all the required values

C.  

Return the nodes to the original build state

D.  

Check vCenter and troubleshoot the build failure

Discussion 0
Question # 2

A VxRail 7.0.100 environment is managed by the internal vCenter Server. The customer asks the implementation engineer to deploy a new VxRail cluster using the existing vCenter Server.

What should the response of the engineer?

Options:

A.  

Not supported for internal vCenter Server

B.  

Not supported on VxRail software 7.0.100

C.  

Supported by neither the internal vCenter Server nor external vCenter Server

D.  

Only supported on VxRail software 4.7.xxx

Discussion 0
Question # 3

What is a requirement for the vSAN Data-at-Rest Encryption?

Options:

A.  

All-Flash or AII-NVMe VxRail

B.  

VxRail with at least 3 nodes

C.  

External Key Management Server

D.  

External customer provided vCenter

Discussion 0
Question # 4

What is a consideration when adding nodes to a VxRail G Series chassis?

Options:

A.  

G560 and G410 nodes are permitted in the same chassis

B.  

In a full G Series chassis, all nodes must have 10GbE ports

C.  

Hybrid and All-Flash nodes are permitted, if in different chassis

D.  

All nodes in a G Series chassis must be identical

Discussion 0
Question # 5

What must be used when deploying VxRail with a customer-supplied VDS?

Options:

A.  

Deployment Wizard using the configuration file method

B.  

Deployment Wizard using the step-by-step method

C.  

VxRail API with configuration file

D.  

VxRail PowerShell SysBringUp Module

Discussion 0
Question # 6

Which VxRail model(s) has a non-mirrored IDSDM?

Options:

A.  

D560/F

B.  

All G Series

C.  

S570

D.  

All E Series

Discussion 0
Question # 7

What is the correct CLI command to collect only the vCenter logs on VxRail Manager

Options:

A.  

vc-support.sh –v

B.  

generateFullBundle.py –v

C.  

vc-support-bundle.sh –c

D.  

generateLogBundle.py –c

Discussion 0
Question # 8

A VxRail E560F model was delivered six months ago and is now scheduled to be installed with the target code. What is the correct order of steps to complete this task?

Question # 8

Options:

Discussion 0
Question # 9

What is the maximum number of supported nodes in a VxRail Stretch Cluster?

Options:

A.  

16

B.  

30

C.  

32

D.  

64

Discussion 0
Question # 10

What is validated by running the Proactive Network Performance test in vCenter on a VxRail cluster?

Options:

A.  

Latency and bandwidth measurement to the witness host

B.  

Network configuration and performance for vSAN

C.  

Network performance for virtual machines

D.  

Latency measurement between DCs for Stretched Clusters

Discussion 0
Question # 11

What is the correct sequence of steps to perform a RASR Factory Reset using an SD card?

Question # 11

Options:

Discussion 0
Question # 12

A VxRail implementation engineer is validating the network environment with NVT. The proposed switch configuration is shown in the exhibit. The ToR Switch information file is available.

Use the VxRail simulator to set up NVT for switch validation. Import the switch Information and tag the ports based on the exhibit.

Question # 12

Options:

Discussion 0
Question # 13

What is the maximum number of supported nodes for a VxRail cluster running on a 1 GbE network?

Options:

A.  

4

B.  

5

C.  

16

D.  

32

Discussion 0
Question # 14

An implementation engineer is tasked with setting up RecoverPoint for VMs on a new 4-node E Series VxRail duster How many VMs are licensed to be protected on the cluster?

Options:

A.  

5

B.  

10

C.  

20

D.  

25

Discussion 0
Question # 15

From what environment must a network administrator run VxRail network validation?

Options:

A.  

Windows PowerShell command prompt

B.  

Same subnet as VxRail Management Network

C.  

Top of Rack switches

D.  

VxRail Deployment Wizard

Discussion 0
Get DES-6322 dumps and pass your exam in 24 hours!

Free Exams Sample Questions