Winter Special Sale Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 2493360325

Good News !!! VCS-260 Administration of Veritas InfoScale Availability 7.3 for UNIX/Linux is now Stable and With Pass Result

VCS-260 Practice Exam Questions and Answers

Administration of Veritas InfoScale Availability 7.3 for UNIX/Linux

Last Update 3 days ago
Total Questions : 86

Administration of Veritas InfoScale Availability 7.3 for UNIX/Linux is stable now with all latest exam questions are added 3 days ago. Incorporating VCS-260 practice exam questions into your study plan is more than just a preparation strategy.

VCS-260 exam questions often include scenarios and problem-solving exercises that mirror real-world challenges. Working through VCS-260 dumps allows you to practice pacing yourself, ensuring that you can complete all Administration of Veritas InfoScale Availability 7.3 for UNIX/Linux practice test within the allotted time frame.

VCS-260 PDF

VCS-260 PDF (Printable)
$210
$525

VCS-260 Testing Engine

VCS-260 PDF (Printable)
$210
$525

VCS-260 PDF + Testing Engine

VCS-260 PDF (Printable)
Question # 1

Which service group dependency type supports two applications being online on any system in the cluster?

Options:

A.  

parallel

B.  

global

C.  

local

D.  

remote

Discussion 0
Question # 2

Which action should an administrator take to avoid single points of failure when making an application highly available?

Options:

A.  

utilize cross-over network cables for heartbeats with multi-node clusters to withstand power outages

B.  

place application binaries on shared storage to reduce the chance of corruption

C.  

use host IP address for configuring and accessing application from various clients

D.  

ensure multiple paths for data access so the applicantion can continue if one path goes down

Discussion 0
Question # 3

A multi-tier application has Oracle at the first level and WebSphere at the second level, which depends on the Oracle application. The Oracle and WebSphere service groups are configured in two separate cluster. The administrator wants the following fault behavior:

  • when the Oracle service group faults, the WebSphere service group should stay online
  • when the Oracle service group comes back online, the WebSphere service group should be taken offline and brought back online

Which type of dependency must the administrator configure to acquire the desired behavior?

Options:

A.  

virtual business services with soft type of fault dependency

B.  

virtual business services with an online global firm dependency

C.  

virtual business services with firm type of fault dependency

D.  

virtual business services with restart type of fault dependency

Discussion 0
Question # 4

An administrator is attempting to start Veritas Cluster Server (VCS) on a node and receives the following message:

Question # 4

Which two actions can the administrator perform to resolve this problem? (Choose two.)

Options:

A.  

run hacf –createconfig on the affected node

B.  

start the VCS engine, HAD, on another system that has a valid configuration file

C.  

re-run the hastart command with the –force option

D.  

copy a valid configuration file to the local system and restart VCS with the –force option

E.  

check the system heartbeat connections

Discussion 0
Question # 5

A cluster configured with disk based I/O fencing has two dedicated high-priority LLT links and one low-priority link over public network interface.

What is the state of the cluster if both high-priority links fail simultaneously?

Options:

A.  

All nodes remain in regular GAB membership, but are also in jeopardy membership.

B.  

The cluster is in a split-brain condition until at least one other LLT link is working.

C.  

The cluster with active service groups stays running, but the other shuts down.

D.  

Service groups are unable to failover when resource faults occur, but can failover if a system fault occurs.

Discussion 0
Question # 6

An administrator wants to place an existing application under high availability control.

Which requirement must be met to place the application under high availability control?

Options:

A.  

The application must have defined start, stop, and monitor procedures.

B.  

The application must have an unlimited license model.

C.  

The application must have an enterprise agent available on SORT.

D.  

The application must run in kernel space.

Discussion 0
Question # 7

Which action should an administrator perform to ensure the coordination point (CP) service is highly available when adding a CP server into a Veritas Cluster Server environment?

Options:

A.  

configure multiple CP server instances on the same node

B.  

configure the CP server as a resource in a Veritas cluster

C.  

configure the CP server database on a multipathed disk

D.  

ensure the CP server is on a reliable network

Discussion 0
Question # 8

What happens when a split-brain occurs and I/O fencing is disabled?

Options:

A.  

All nodes are placed in jeopardy membership.

B.  

All service groups are autodisabled.

C.  

Nodes on each side of the split try to bring service group online.

D.  

All nodes execute a stop operation.

Discussion 0
Question # 9

Which command should an administrator perform to transition a resource state from ‘waiting to go online’ to ‘not waiting’ if the operation hangs on a particular resource?

Options:

A.  

hagrp –flush

B.  

hagrp –flush –force

C.  

hares –flushinfo

D.  

hares –clear

Discussion 0
Question # 10

An administrator is evaluating the suitability of an application to be clustered which can failover to another node in the cluster in an event of an application outage using Veritas InfoScale Availability.

Which condition prevents the application from being made highly available?

Options:

A.  

The application requires the use of solid state drives for performance.

B.  

The cluster is NOT configured with public low priority link.

C.  

Individual unique instances of the application cannot be monitored on the system the application is running.

D.  

After a crash, the automated clean-up takes at least one minute before the application can be restarted.

Discussion 0
Get VCS-260 dumps and pass your exam in 24 hours!

Free Exams Sample Questions