PMP Practice Questions

Project Management Professional (PMBOK 7th Version)

Last Update 2 days ago
Total Questions : 2196

Dive into our fully updated and stable PMP practice test platform, featuring all the latest Project-Management-Professional exam questions added this week. Our preparation tool is more than just a PMI study aid; it's a strategic advantage.

Our free Project-Management-Professional practice questions crafted to reflect the domains and difficulty of the actual exam. The detailed rationales explain the 'why' behind each answer, reinforcing key concepts about PMP. Use this test to pinpoint which areas you need to focus your study on.

PMP PDF

PMP PDF (Printable)
$139.65
$399

PMP Testing Engine

PMP PDF (Printable)
$157.15
$449

PMP PDF + Testing Engine

PMP PDF (Printable)
$209.65
$599
Question # 451

A project requires testing of the final product to be done at another department ' s

testing facility, which is known for having low availability. This situation could potentially

impact the project schedule.

What should the project manager do next?

Options:

A.  

Update the risk register.

B.  

Update the issue log.

C.  

Update the lessons learned register.

D.  

Update the project schedule.

Discussion 0
Question # 452

A project manager is leading an electrical project that spans five towns. The project

manager is informed by the team that one of the towns is not allowing the team to work there even though the town was included in stakeholder engagements before the start of the project.

What should the project manager do?

Options:

A.  

Change the project scope and seek approval to exclude this town from the overallproject.

B.  

Engage with the town ' s authorities to discuss the reason for the change in commitmentand agree on a solution.

C.  

Instruct the team to move to the next town and continue the project to avoid further delays.

D.  

Retrieve all minutes of stakeholder engagements and send to the town as a reminder of their commitment to the project.

Discussion 0
Question # 453

A team is the first team m the company to use agile methods for a traditional project. The team ' s manager is concerned that the risks are not being managed. What should the team do to assess and manage risks regularly?

Options:

A.  

Identify and escalate any identified risks to the facilitator to handle

B.  

Update the risk register during every iteration with any open concerns

C.  

Use regular feedback loops through daily standups iteration demos and retrospectives

D.  

Focus on developing a working deliverable instead of documenting risks

Discussion 0
Question # 454

In a hybrid project, 100 new base stations are being added to a 4G mobile network

every month. At the end of the first month, the team is behind the target and the operator is

losing money. The stakeholders are requesting information on when the base stations can go

live and begin to bill.

What should the project manager do to take the schedule back and accelerate the return on

investment (ROI) of the project?

Options:

A.  

Change the project approach to predictive.

B.  

Increase reporting to the business.

C.  

Clarify the agile and predictive modules.

D.  

Reconsider necessary schedule reserves.

Discussion 0
Question # 455

A project sponsor asks the project manager to explore a hybrid approach for a new

project. The product manager for this project has already prepared a detailed specification for the product.

What should the project manager do to proceed with the project management plan?

Options:

A.  

Ask the team to assess whether the product specification can be expressed in userstories to enable a Scrum or Kanban approach.

B.  

Explore with the product manager to determine if there are viable opportunities todeliver value incrementally and increase business value.

C.  

Recommend to the project sponsor that a predictive approach is appropriate for theproject due to the stable product requirements.

D.  

Ask the product manager whether they are prepared to act as product owner for theproject in order to participate in iterative planning and reviews.

Discussion 0
Question # 456

On a recently completed prefect a project manager noticed that some of the subcontractors approached the client directly with questions. These subcontractors had a previous direct reporting relationship with the client. The project manager is now in the initial stage of a new project with the same subcontractors and client.

How should the project manager set up communications?

Options:

A.  

Inform the client that all communications moving forward will go through the project manager

B.  

Ensure that the communications management plan covers contractual obligations

C.  

Consult the communications management plan from a recent project that has been closed

D.  

Update the communications management plan to allow the subcontractors to communicate directly with the client

Discussion 0
Question # 457

A team Is experiencing difficulties and has decided to use a spike. Please click on the portion of the burndown chart that corresponds to the spike.

Question # 457

Options:

Discussion 0
Question # 458

A project manager is assigned midway through a project. The team members are in

different locations across the country and they are unable to meet in-person often. During a status review meeting, one of the stakeholders highlighted that they were unaware of the status for the project deliverables.

What should the project manager do first?

Options:

A.  

Request the project team include the stakeholder ' s details and make sure the projectstatus reports are shared with the stakeholder.

B.  

Schedule a meeting with the stakeholder and include the stakeholder ' s needs in the project management plan.

C.  

Review the stakeholder management plan and update the stakeholder register forincorporation in the project management plan.

D.  

Review the communications management plan and verify whether the stakeholder ' s needs are captured in the project management plan.

Discussion 0
Question # 459

A project manager primarily works on implementation projects Depending on the deliverable, the project manager is able to estimate the time line based on previous projects. The project manager now receives a project that is different from the previous implementation projects.

What should the project manager do next?

Options:

A.  

Refer to the previous protect they worked on and base the estimate on that

B.  

Use expert judgment to estimate the schedule and then adjust the schedule as the project progresses

C.  

Ask the project management office (PMO) by when the project can be completed and use that date as the project time line

D.  

Break down the project into smaller tasks and estimate the durations of the activities

Discussion 0
Question # 460

During a team meeting the project manager asks the team to complete a personality assessment to help everyone understand themselves and one another better. The project manager analyzes the results and realizes that more than one-half of team members are introverts

What should the project manager do?

Options:

A.  

Present brainstorming topics a day before the session so the team can reflect and contribute more fully during the session

B.  

Adjust the lighting and ambient sounds in the work and common areas to create a relaxing work atmosphere

C.  

Ensure the team understands that their input needs to be fully articulated and explained to all team members during daily standups

D.  

Require everyone to share personal details at the start of each team meeting to allow learn members to get to know one another

Discussion 0
Question # 461

In an agile product development environment, work is distributed to Cities A, B, and

C, which are geographically dispersed. The small teams work and collaborate to deliver the

sprints.

• City A ' s team focuses on the features of data capture.

• City B ' s team focuses on the user experience and development pieces.

• City C ' s team coordinates testing.

What should the project manager do to ensure a successful rollout of sprints?

Options:

A.  

Ensure all three teams deliver independently without interactions so that they remainfocused and meet customer requirements.

B.  

Implement communication techniques and ensure the teams follow a relay pattern ofhanding off work from one team to the other.

C.  

Use a fishbone analysis to resolve problems and iron out communication issuesbetween the teams.

D.  

Maintain localized teams to circumvent the challenges of delay or any otherunforeseen risks that might prevent progress.

Discussion 0
Question # 462

A company made several changes recently, which resulted in a positive change in

the company culture. A project manager was just assigned to report to a new project

supervisor whose leadership style is about getting things done quickly regardless of employee

and operational impacts. Some employees are complaining about this.

What should the project manager do?

Options:

A.  

Clarify expectations by explaining the company culture with the supervisor.

B.  

Ask senior management to move the supervisor to a different project.

C.  

Revisit the company ' s organizational culture.

D.  

Instruct the employees to listen to the supervisor.

Discussion 0
Question # 463

A globally distributed project team is running behind schedule due to the lack ol team commitment and low morale. In order to bring the schedule back on track, what should the project manager do first?

Options:

A.  

Seek the sponsor ' s approval to extend the project schedule.

B.  

Set up a meeting to perform a root cause analysis.

C.  

Update the issue log and communicate it to the team.

D.  

Permanently colocate the team for better performance.

Discussion 0
Question # 464

A project manager learns from a marketing analyst that a competitor just published a press release announcing a product launch using a specific innovation The project manager is concerned because the company is initiating a project involving the same innovation A key goal of the new project is that the product will be the first to market won the innovation

What should the project manager do next?

Options:

A.  

Document the issue in the issue log and escalate to the project sponsor

B.  

Inform the project sponsor and suggest canceling the project

C.  

Review the project goals and eat criteria m the project charter

D.  

Ask the leader of research and development to decide on next steps

Discussion 0
Question # 465

A project manager is managing two integrated projects in a program A key integration point is misaligned, which has resulted in delays. One of the team ' s integration leads is a subject matter expert (SME) m this integration area. The other team ' s integration lead is not a SME but is more senior and has worked on the project longer Both team leads are blaming each other

What should the project manager do first to resolve this situation?

Options:

A.  

Assign the resolution of the issue to the senior integration lead who has worked on the project longer

B.  

Meet with both integration leads to understand the root cause and determine a resolution

C.  

Escalate the issue to the program architect who developed the integration plan

D.  

Assign the resolution of this issue to the integration lead who is a SME

Discussion 0
Question # 466

The marketing team is moving from predictive to hybrid approaches for their projects. The marketing director is not familiar with hybrid approaches and does not support the new direction. What should the project manager do?

Options:

A.  

Advise the marketing director to receive formal training.

B.  

Ask the marketing team members to coach their director.

C.  

Train the marketing team and keep their director informed.

D.  

Mentor the marketing director on the approaches.

Discussion 0
Question # 467

A government agency is developing a new connectivity policy. The assigned project

manager is a famous economist with international recognition. The team is eager to work with

the project manager, but feels intimidated. The project manager realizes that a junior

economist, whose tasks are behind schedule, is especially intimidated by the situation.

What should the project manager do first?

Options:

A.  

Evaluate the performance of the junior economist in the upcoming months.

B.  

Reassign some of the junior economist ' s tasks to other economists.

C.  

Request to replace the junior economist with a more experienced economist.

D.  

Consider organizing paired work sessions for the junior and senior economists.

Discussion 0
Question # 468

A project sponsor wants to develop software that would have 30 features and would be used in 10 different countries. The team feels overwhelmed with the amount of work to be done. What should the project manager do?

Options:

A.  

Encourage and motivate the team with project incentives

B.  

Subdivide the team to handle different aspects of the project

C.  

Support the team to find and execute the minimum viable product (MVP)

D.  

Organize project execution to satisfy the project sponsor s request

Discussion 0
Question # 469

A project manager is leading a project that is in the execution phase. During a team

meeting, the project manager realizes that there are two team members who lack the

technical skills required for some of the upcoming tasks.

What should the servant leader project manager do next?

Options:

A.  

Recommend to the team members to upskill themselves on the requirements for theproject.

B.  

Discuss with the human resource (HR) manager about the possibility of changing teammembers.

C.  

Inform the sponsor about a possible delay due to the lack of skills in the team.

D.  

Explore a training program that is within the project budget for the team members.

Discussion 0
Question # 470

A project manager is leading the first agile project for the organization. During the

kick-off meeting, the project manager notices that the team does not have the same

understanding about agile approaches. The project manager is concerned about the impact of that confusion.

What should the project manager do to address this situation?

Options:

A.  

Evaluate the possibility of managing this project using a predictive approach.

B.  

Submit a change request for a new team that has agile experience.

C.  

Mentor the team to explain agile principles and create a shared understanding.

D.  

Hire a functional manager who is familiar with agile methodologies.

Discussion 0
Question # 471

A new sales software development project is underway The customer is still finalizing the requirements for the system when a new CEO is introduced. The new CEO is expected to make changes to the organization, which most likely will impact development. However, the most important criterion for the project is that the software must provide correct sales results. No intermediate results are required.

Which project approach should the project manager take?

Options:

A.  

Incremental

B.  

Predictive

C.  

Hybrid

D.  

iterative

Discussion 0
Question # 472

A project team has transitioned to full-time remote working. The project manager

started noticing that some team members have not been completing their assigned tasks by

the planned dates despite reminders during weekly team meetings. This has the potential for

delaying the project delivery.

How should the project manager resolve this situation?

Options:

A.  

Communicate the delivery dates twice a week to the team members to ensure timelydelivery.

B.  

Set up review sessions with each of the team members to identify the root cause ofdelays.

C.  

Mentor the team members to work in a remote work environment to ensureproductivity.

D.  

Talk to the resource managers regarding the delay and request additional resources

Discussion 0
Question # 473

During the last two iterations of a project, one of the team members had low performance. The project manager conducted two feedback sessions with the team member and escalated the issue to the resource manager and project sponsor, but there has been no improvement.

What should the project manager do next?

Options:

A.  

Escalate the situation again to the project sponsor.

B.  

Review this obstacle during the daily standup meeting.

C.  

Request a new resource to execute the activities.

D.  

Provide feedback to the resource at the sprint review.

Discussion 0
Question # 474

During the daily standup meeting that is assessing progress against the current sprint, a team member reports some delays due to a component

managed by an external vendor. How should the project manager address the team member ' s concern?

Options:

A.  

Ask the team member to resolve the issue independently to minimize further delays.

B.  

Ask the team member to provide details to address the issue with the vendor.

C.  

Implement fast tracking to reduce the impact of the delay on the sprint.

D.  

Update the communications management plan to prevent future reoccurrence.

Discussion 0
Question # 475

During execution of an agile project, a project manager realizes the budget is almost completely used, but the project is not close to being completed. What should the project manager do to address this concern?

Options:

A.  

Review the project time line and find opportunities to reduce the project schedule.

B.  

Review the budget with the project sponsor and ask for an increase to the budget

C.  

Review the backlog and find opportunities to reprioritize the work and reduce the project scope

D.  

Review the resource management plan and find opportunities to reduce project costs.

Discussion 0
Question # 476

A project manager ' s customer is new to agile approaches. When the customer found out that the project was going to use an agile approach, the customer became

concerned that the product quality will be sacrificed.

What should the project manager do?

Options:

A.  

Ensure that the customer and the delivery team agree on the definition of done (DoD) in the beginning of the project.

B.  

Invite the customer to join the daily standup meetings to better understand the product design and progress.

C.  

Ensure the team demonstrates product features to this customer regularly to collect feedback and improve as needed.

D.  

Invite the customer to join the regular sprint planning sessions to better understand the project ' s progress.

Discussion 0
Question # 477

A project is about to close and the project manager is p Set up a meeting to perform a root cause analy reparing a draft of the project closure report. The project sponsor has approached the project manager to stay on longer to ensure the benefits in the charter are tracked as completed However, some of the benefits will not be realized until 1year after project implementation.

What should the project manager do?

Options:

A.  

Explain to the project sponsor that the project manager is only accountable for managing the project scope budget quality and schedule

B.  

Document who will be tracking benefits realization what will be tracked and when it will be tracked in the project closure report

C.  

Explain to the project sponsor that they are accountable for tracking benefits realization after project completion

D.  

Discuss extending the project manager ' s allocation to the project until all benefits are realized with the project management office (PMO)

Discussion 0
Question # 478

A project manager is establishing a project management office (PMO) for a

company-wide program to implement a software based on artificial intelligence (AI). As part of the PMO tasks, some stakeholders need help understanding how to deal with difficult situations.

Which activity should the project manager use to help train the stakeholders?

Options:

A.  

Contract negotiation

B.  

Team assessment

C.  

Mentoring and coaching

D.  

On-the-job training

Discussion 0
Question # 479

At the end of a project, one of the suppliers is facing financial difficulties and is

pushing the project manager to obtain financial, legal, and administrative approval in order to

communicate formal project closure and ensure the transfer of liability. What should the

project manager do next?

Options:

A.  

Compare the achieved results to the contract requirements.

B.  

Make the final payment as the project is completed.

C.  

Transfer the remaining variances and close the project.

D.  

Escalate to higher management to expedite the approval.

Discussion 0
Question # 480

A regulatory branch of an environmental government agency has recently placed a ban on the manufacturing of a specified thickness of plastic packaging products. This ban will take effect in 12 months. The project manager for a startup firm working in alternative packaging has been monitoring the progress of this law for a while and. as part of the risk management, has identified new products that can support a growing customer base.

What should the project manager do next?

Options:

A.  

Continue production processes and plan to discuss changes at the next annual target review meeting.

B.  

Begin a marketing campaign to sell alternative packaging after the 12-month period ends.

C.  

Inform management of the new law as an opportunity to expand market share and share the proposed products

D.  

Organize a meeting with all stakeholders and review the stakeholder engagement plan

Discussion 0
Question # 481

An international client contacted a software development company to build out a

software product, and an agile project manager was assigned. At one of the review meetings,

the client complains that a feature mentioned at the initial debriefing was not implemented.

What should the project manager do?

Options:

A.  

Include the mentioned feature in the prioritized requirements list.

B.  

Assign a team member to immediately start working on that feature.

C.  

Review the original project documentation to confirm.

D.  

Treat it as a change request and assess the effect on the project ' s goals.

Discussion 0
Question # 482

An agile leader is working on a complex project that is entering the final phase where solutions from different vendors are being integrated. This is the most critical delivery stage for the project

How should the agile leader ensure successful delivery?

Options:

A.  

Ensure participation from all team members

B.  

Ask the client to attend all daily calls.

C.  

Ensure cross-departmental teams are colocated

D.  

Request additional project resources

Discussion 0
Question # 483

A project manager submits several requests to purchase required hardware and

knows from previous experience that this kind of procurement usually results in disputes

between the company and its suppliers. How can the project manager mitigate this risk in the

request for proposal (RFP) with suppliers?

Options:

A.  

Ask the legal team to review the RFP.

B.  

Ask the project team to submit the RFP.

C.  

Request approval of the RFP from the project sponsor.

D.  

Request approval of the RFP from management.

Discussion 0
Question # 484

A project team is reviewing solved project issues from the last phase of a project. The lead risk analyst points out that the next phase of the project includes a critical element with some

reserves needed

What should the project manager do to successfully complete the next phase?

Options:

A.  

Request a reserve analysis and update the risk management plan

B.  

Update the risk response plan to include the needed reserve

C.  

Perform a schedule network analysis to avoid any critical path delays

D.  

Review the risk response plan to verify inclusion of the needed reserve

Discussion 0
Question # 485

A new privacy law will go into effect at the beginning of the next calendar year. The project manager realizes the project needs to be compliant with the new law. What should the project manager do next?

Options:

A.  

Inform the project steering committee of this constraint.

B.  

Inform the project team and create a spike for the next Iteration.

C.  

Inform the legal department that the project scope will be updated.

D.  

Inform the product owner that the project will continue as planned.

Discussion 0
Question # 486

A hybrid project manager has taken over a large-scale software development project m a highly regulated environment. During a handover session the outgoing project manager explains that they devised their own status reports which is different from the project management office ' s (PMO ' s) status report style. The project stakeholders are extremely particular about the information they receive in updates and do not believe the PMO ' s status reports have sufficient enough information

How should the new project manager proceed*?

Options:

A.  

Continue using the outgoing project manager ' s status reports as well as their approach for schedule reporting

B.  

Explain to the PMO that the hybrid project team needs to keep an agile approach for reporting and will not be complying with the organizational standard

C.  

Change the status reports according to the template supplied by the PMO and proceed with scheduled reporting

D.  

Meet with the project stakeholders to explain the need to comply with the PMO standards and update the status report format accordingly

Discussion 0
Question # 487

A project has been running successfully for 2 months. At a regular project meeting,

the team raises several potential obstacles to future progress. The obstacles include vendor

delivery performance, technical performance of a subsystem, and conflict with another division of the organization.

What should the project manager do next?

Options:

A.  

Work with the team and others in the network to assess and prioritize the obstacles.

B.  

Engage with the external stakeholders and the other division of the organization toresolve the issues.

C.  

Escalate the obstacles to the project sponsor for assistance with resolution.

D.  

Determine a change response to identify and resolve the obstacles to move the projectforward.

Discussion 0
Question # 488

A project manager is assigned to deliver an innovative solution that is part of a

brand new offering. The project manager reviews the request for proposal (RFP) and realizes that key terms are restricted to technical resource assignments. There is also a gap in addressing compliance.

How should the project manager bridge the gap and ensure the project delivers the expected

business value?

Options:

A.  

Determine the critical requirements.

B.  

Document the risks and mitigations.

C.  

Define the project schedule.

D.  

Create a project scope statement.

Discussion 0
Question # 489

A few key stakeholders are concerned about how the prefect team is planning to develop some features tor a new product. They know that the requirements associated with these features are unstable but are also highly strategic for adding value to the product and the customer.

What should the project manager do?

Options:

A.  

Suggest an agile approach to refine these requirements and prioritize them according to the project objectives

B.  

Validate the prioritization of all requirements with the sponsor and share the results with the stakeholders

C.  

Review the project governance to validate the policies procedures and guidelines used to prioritize the project

D.  

Ask the stakeholders to refine these requirements at a level of detail that becomes more stable and measurable

Discussion 0
Question # 490

A project team has been together for a long time and has been led by three different

project managers. Lately, the performance of one of the team members has been declining

and has affected the project delivery.

What should the current project manager do to ensure that team performance is improved and

sustained?

Options:

A.  

Liaise with the functional managers to replace the team member.

B.  

Engage with the team member and draw up a development plan.

C.  

Organize quarterly team-building events.

D.  

Request that a new team member be added to the team

Discussion 0
Question # 491

A project manager is working on a critical path activity and notices a delay in product delivery due to an anticipated event What should the project manager do first?

Options:

A.  

Follow the risk response plan

B.  

Use the contingency fund

C.  

Prepare a change request

D.  

Update the risk register

Discussion 0
Question # 492

A project manager is assigned to an important company project. While reviewing the lessons learned from a similar, previous project, the project manager finds that the biggest challenges were related to learn motivation.

What should the project manager do to avoid these challenges?

Options:

A.  

Increase the project budget by 10% for team-related activities and awards.

B.  

Plan to implement team-building strategies throughout the project.

C.  

Ask the functional manager to motivate the team outside of the project.

D.  

Colocate the team to encourage more motivational team activities.

Discussion 0
Question # 493

A telecommunications company is doing a national network rollout involving continuously changing technical requirements. To address the situation the company has recently adopted a hybrid project life cycle. During a retrospective some team members complain that me majority of me stones are ready to test but have not advanced because they are waiting for the project manager ' s approval.

What should the project manager do?

Options:

A.  

Update the issue log and review the lessons learned register for options

B.  

Implement conflict resolution to accommodate the team ' s needs

C.  

Implement decision-making techniques to advance the stones

D.  

Empower the team to self-organize and make their own decisions

Discussion 0
Question # 494

A project manager is working on a project that has strict deadlines and budget restrictions. The project manager realizes that in order to win the bid the company submitted a significantly tower bid than their local competitors leaving a thin profit margin. The client is constantly submitting change requests and. unfortunately, these change requests are stretching both the schedule and the budget

What should the project manager do?

Options:

A.  

Instruct the team to accommodate the changes to the project

B.  

Review the project charter to identify the agreed scope

C.  

Negotiate the impact of these changes with the client

D.  

Escalate the issue to senior management

Discussion 0
Question # 495

A project team that is very experienced in enterprise resource planning (ERP)

systems implementation is currently planning the delivery of a new ERP project. There is a

requirement to reuse the client ' s security subsystem developed by a third party. The client

states that integration with the security subsystem must be done by the client ' s team. The

project manager does not want to have such an external dependency.

What should the project manager do first?

Options:

A.  

Plan the implementation of this integration in the first iteration to help reduce risks.

B.  

Record the issue in the issue log and closely manage this dependency.

C.  

Inform the client that the project team will take care of the integration.

D.  

Document the client ' s responsibility for the integration with the security subsystem.

Discussion 0
Question # 496

A team is working on a hybrid project. Due to different interpretations of the project requirements, the deliverables are not aligned to the expectations. What steps should the project manager have taken to prevent this?

Options:

A.  

Update the project management plan in order to get back on track.

B.  

Ensure the team receives continuous feedback from customers users.

C.  

Submit a change request to adjust the project scope.

D.  

Ensure the team understands all additional project requirements.

Discussion 0
Question # 497

After difficult negotiations, a customer committed to pay the cost for changes to the

project scope. The team seems unhappy as the project completion time will take longer than

previously scheduled.

How should the project manager support the outcome of the new agreement?

Options:

A.  

Motivate the team and deploy the necessary resources.

B.  

Find a way to maintain the project schedule.

C.  

Impose authority on the project.

D.  

Request additional resources from the sponsor and motivate the team.

Discussion 0
Question # 498

A team lead has been highly engaged and involved in a project and is operating without a chain of command or authority levels What is the team lead dang1?

Options:

A.  

Modeling directive leadership

B.  

Modeling commanding leadership

C.  

Modeling adaptive leadership

D.  

Modeling servant leadership

Discussion 0
Question # 499

A project manager is leading an automation project. The project team is colocated

and includes people from both the technical and business units. The project manager

discovers that personal differences and work styles are affecting the project negatively.

How should the project manager address this?

Options:

A.  

Develop a schedule that ensures people with personal differences work separately.

B.  

Use an approach to the project that does not involve colocation.

C.  

Meet with the team and agree on expectations from team members.

D.  

Invite the functional managers of the different units to address their personal differences.

Discussion 0
Question # 500

In a software project using an agile approach, there have recently been work

overruns. After assessing the situation, the project manager concluded that the overruns are

occurring because of insufficiently refined product backlog items.

What should the project manager do to correct this issue?

Options:

A.  

Work with the sponsor to revise the product vision.

B.  

Create a definition of ready (DoR) for the backlog items.

C.  

Discuss the issue with the service request manager.

D.  

Refine the product backlog items with the stakeholders.

Discussion 0