Summer Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

LEED-AP-BD+C LEED AP Building Design + Construction (LEED AP BD+C) is now Stable and With Pass Result | Test Your Knowledge for Free

Exams4sure Dumps

LEED-AP-BD+C Practice Questions

LEED AP Building Design + Construction (LEED AP BD+C)

Last Update 2 days ago
Total Questions : 404

Dive into our fully updated and stable LEED-AP-BD+C practice test platform, featuring all the latest Leadership in Energy and Environmental Design (LEED) exam questions added this week. Our preparation tool is more than just a USGBC study aid; it's a strategic advantage.

Our free Leadership in Energy and Environmental Design (LEED) practice questions crafted to reflect the domains and difficulty of the actual exam. The detailed rationales explain the 'why' behind each answer, reinforcing key concepts about LEED-AP-BD+C. Use this test to pinpoint which areas you need to focus your study on.

LEED-AP-BD+C PDF

LEED-AP-BD+C PDF (Printable)
$54.25
$154.99

LEED-AP-BD+C Testing Engine

LEED-AP-BD+C PDF (Printable)
$59.5
$169.99

LEED-AP-BD+C PDF + Testing Engine

LEED-AP-BD+C PDF (Printable)
$74.55
$212.99
Question # 91

A project team develops a site plan for a school project with an athletic field and a playground with real grass. In order to qualify for the Water Efficiency Prerequisite, Outdoor Water Use Reduction, the landscape area calculations:

Options:

A.  

Must include the athletic field and playground

B.  

May include the playground but must exclude the athletic field

C.  

Must include the playground but exclude the athletic field

D.  

May include or exclude the athletic field and the playground

Discussion 0
Question # 92

Which of the following is a biofuel that is considered renewable energy under Energy and Atmosphere Credit, Renewable Energy Production?

Options:

A.  

Combustion of municipal solid waste

B.  

Non-mill residue forestry biomass waste

C.  

Wood coated with paints, plastics, or resins

D.  

Animal waste

Discussion 0
Question # 93

When considering the Indoor Environmental Quality Credit, Thermal Comfort, what is the minimum percentage of building occupants that must have individual comfort controls?

Options:

A.  

10%

B.  

25%

C.  

50%

D.  

75%

Discussion 0
Question # 94

A comprehensive rainwater management plan may include design elements such as

Options:

A.  

artificial turf, bioretention pond, cisterns and hay bales

B.  

cisterns, porous pavement, swales and vegetated roofs

C.  

soil compaction, swales, vegetated roofs and xeriscaping

D.  

bioretention pond, cisterns, porous pavement and stabilized construction entrance

Discussion 0
Question # 95

What LEED Building Design and Construction rating system mandates a preliminary LEED meeting with the principal members of the project team to create a LEED action plan that includes the anticipated certification tier, targeted credits and parties responsible for each credit?

Options:

A.  

Healthcare

B.  

Schools

C.  

Data centers

D.  

Hospitality

Discussion 0
Question # 96

Which of the following management measures is used to minimize the spread of infection in indoor environments?

Options:

A.  

Promote natural ventilation in maintenance areas

B.  

Monitor and adjust indoor humidity levels only for occupant comfort

C.  

Implement regular air-filtration system inspections and maintenance

Discussion 0
Question # 97

Which of the following contributes to the value of the commissioning process?

Options:

A.  

Ensuring that the project budgetary goal is met

B.  

Verifying that the building systems perform as intended

C.  

Verifying that the building water fixtures are installed properly

D.  

Ensuring that the project is delivered to meet the permitting requirements

Discussion 0
Question # 98

The Solar Reflectance Index (SRI) includes the measure of a material's

Options:

A.  

color (shade of gray)

B.  

ability to reflect solar radiation

C.  

ability to absorb solar radiation

D.  

ability to reflect thermal radiation

Discussion 0
Question # 99

What are the Storage and Collection of Recyclables requirements for only Retail projects under the Materials and Resources Prerequisite?

Options:

A.  

Retail projects must conduct a waste stream audit for the duration of the project in an existing location or make projections based on historical data for similar establishments. Identify the top-five recyclable waste streams while stating the top-four waste streams where both collection and storage space will be provided

B.  

Retail projects must conduct a waste stream audit once a month for the project in an existing or rented location or make projections based on data gathered from a previous cycle. Identify the top-three recyclable waste streams while stating the top-two waste streams where both collection and storage space will be provided

C.  

Retail projects must conduct a waste stream audit twice a year for the project in an existing or rented location or make projections based on the previous year's data for their business. Identify the top-four recyclable waste streams while stating the top-three waste streams where both collection and storage space will be provided

D.  

Retail projects must conduct a waste stream audit for the once a year for the project in an existing or rented location or make projections based on the previous year's data for their business. Identify the top-four recyclable waste streams while stating the top-three waste streams where both collection and storage space will be provided

Discussion 0
Question # 100

At the time of registering a project in LEED Online, Regional Priority credits are determined based upon the project's

Options:

A.  

environmental zone

B.  

longitude and latitude

C.  

ASHRAE 90.1 - 2010 climate zone

D.  

Environmental Protection Agency Phase I Assessment

Discussion 0
Get LEED-AP-BD+C dumps and pass your exam in 24 hours!

Free Exams Sample Questions