Pre-Summer Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

LEED-AP-BD+C LEED AP Building Design + Construction (LEED AP BD+C) is now Stable and With Pass Result | Test Your Knowledge for Free

Exams4sure Dumps

LEED-AP-BD+C Practice Questions

LEED AP Building Design + Construction (LEED AP BD+C)

Last Update 2 days ago
Total Questions : 337

Dive into our fully updated and stable LEED-AP-BD+C practice test platform, featuring all the latest Leadership in Energy and Environmental Design (LEED) exam questions added this week. Our preparation tool is more than just a USGBC study aid; it's a strategic advantage.

Our free Leadership in Energy and Environmental Design (LEED) practice questions crafted to reflect the domains and difficulty of the actual exam. The detailed rationales explain the 'why' behind each answer, reinforcing key concepts about LEED-AP-BD+C. Use this test to pinpoint which areas you need to focus your study on.

LEED-AP-BD+C PDF

LEED-AP-BD+C PDF (Printable)
$43.75
$124.99

LEED-AP-BD+C Testing Engine

LEED-AP-BD+C PDF (Printable)
$50.75
$144.99

LEED-AP-BD+C PDF + Testing Engine

LEED-AP-BD+C PDF (Printable)
$63.7
$181.99
Question # 91

According to the Integrative Process Credit, the discovery phase of energy-related systems should identify

Options:

A.  

ventilation rates

B.  

functional performance tests

C.  

thermal comfort ranges

D.  

transportation options

Discussion 0
Question # 92

When the LEED AP is applying the Integrative Process to a Building Design and Construction project, which of the following must be included in the Basis of Design (BOD)?

Options:

A.  

Training requirements

B.  

Allowable tolerance for facility operations

C.  

Facility, system and assembly performance assumptions

D.  

Environmental, energy efficiency and sustainability goals

Discussion 0
Question # 93

Minimizing light trespass is a key component of which of the following credits?

Options:

A.  

Energy and Atmosphere Credit, Optimize Energy Performance

B.  

Energy and Atmosphere Prerequisite, Minimum Energy Performance

C.  

Sustainable Sites Credit, Light Pollution Reduction

D.  

Indoor Environmental Quality Credit, Interior Lighting

Discussion 0
Question # 94

When the LEED AP is applying the Integrative Process to a Building Design and Construction project, which of the following information is required to be present in the Owner's Project Requirements (OPR)?

Options:

A.  

All applicable codes and standards

B.  

Interior finishes related to the project

C.  

All project team members and applicable roles

D.  

Energy efficiency goals and training requirements

Discussion 0
Question # 95

A community center will be built on a plot in two phases. Phase 1 will include the building with a pool and gymnasium, while Phase 2 will include the outdoor grass soccer fields. For Phase 1 to achieve certification, where can the project set the LEED boundary?

Options:

A.  

Around Phase 1 and 2

B.  

Around Phase 1 and 2 while committing to keep the Phase 2 grounds undisturbed

C.  

Around Phase 1

D.  

Around Phase 1 while committing to keep the Phase 2 grounds undisturbed

Discussion 0
Question # 96

A building owner installs a building automation system (BAS) to allow programmable load control. Which of the

following credits can be pursued because of the installation?

Options:

A.  

Energy and Atmosphere Credit, Demand Response

B Energy and Atmosphere Credit, Ongoing Commissioning

B.  

Energy and Atmosphere Credit, Enhanced Commissioning

C.  

Energy and Atmosphere Credit, Enhanced Refrigerant Management

Discussion 0
Question # 97

Which individual occupant lighting control meets the requirements of Indoor Environmental Quality Credit, Interior Lighting?

Options:

A.  

Two Level (on, off)

B.  

Three Level (on, 25%, off)

C.  

Three Level (on, 50%, off)

D.  

Three Level (on, 75%, off)

Discussion 0
Question # 98

The Solar Reflectance Index (SRI) includes the measure of a material's

Options:

A.  

color (shade of gray)

B.  

ability to reflect solar radiation

C.  

ability to absorb solar radiation

D.  

ability to reflect thermal radiation

Discussion 0
Question # 99

The project team wants to modify the design of an office building copy room to minimize the risk of airborne contamination to the surrounding space. The design includes a separate exhaust, but due to design constraints the partition walls of the room cannot run deck-to-deck. What can the team do to achieve Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies?

Options:

A.  

Use MERV 8 (F5), or higher, filters

B.  

Provide a hard-lid ceiling

C.  

Create positive pressure in the room

D.  

Provide a large opening to dilute air contaminates

Discussion 0
Question # 100

The material cost for a project is $100,000. What is the minimum material value needed to achieve Materials and Resources Credit, Building Disclosure and Optimization, Sourcing of Raw Materials, Option 2. Leadership Extraction

Practices?

Options:

A.  

$10,000

B.  

$12,500

C.  

$22,500

D.  

$25,000

Discussion 0