LEED-AP-BD+C Practice Questions

LEED AP Building Design + Construction (LEED AP BD+C)

Last Update 2 days ago
Total Questions : 404

Dive into our fully updated and stable LEED-AP-BD+C practice test platform, featuring all the latest Leadership in Energy and Environmental Design (LEED) exam questions added this week. Our preparation tool is more than just a USGBC study aid; it's a strategic advantage.

Our free Leadership in Energy and Environmental Design (LEED) practice questions crafted to reflect the domains and difficulty of the actual exam. The detailed rationales explain the 'why' behind each answer, reinforcing key concepts about LEED-AP-BD+C. Use this test to pinpoint which areas you need to focus your study on.

LEED-AP-BD+C PDF

LEED-AP-BD+C PDF (Printable)
$54.25
$154.99

LEED-AP-BD+C Testing Engine

LEED-AP-BD+C PDF (Printable)
$59.5
$169.99

LEED-AP-BD+C PDF + Testing Engine

LEED-AP-BD+C PDF (Printable)
$74.55
$212.99
Question # 101

What LEED Building Design and Construction project type should exclude weekend transit service from the transit service level calculations for Location and Transportation Credit, Access to Quality Transit, if the project occupants do not commute to the building during weekends?

Options:

A.  

Schools

B.  

Data centers

C.  

Hospitality

D.  

Warehouses and distribution centers

Discussion 0
Question # 102

A project will renovate a building with historic designation into new office space. The surface area of the existing building structure and envelope is 100,000 ft² (9,290 m²). How much of the existing building will need to be reused to earn 5 points for the Materials and Resource Credit, Building Life-Cycle Impact Reduction?

Options:

A.  

90,000 ft² (8,361 m²)

B.  

There is no minimum

C.  

80,000 ft² (7,432 m²)

D.  

At least 50% of the surface area

Discussion 0
Question # 103

The goal of the design charrette during Integrative Process Prerequisite, Integrative Project Planning and Design is to:

Options:

A.  

Develop the building energy model

B.  

Optimize the green strategies across all aspects

C.  

Calculate the life cycle cost of the building

D.  

Choose an appropriate Commissioning Authority (CxA)

Discussion 0
Question # 104

Which of the following strategies enhances energy resilience by ensuring that critical loads are powered during a grid outage?

Options:

A.  

Increase insulation in the building envelope

B.  

Install a battery energy-storage system

C.  

Implement energy-efficient lighting

Discussion 0
Question # 105

To achieve the Sustainable Sites Credit, Light Pollution Reduction, Option 1. BUG Rating Method, projects must demonstrate:

Options:

A.  

All luminaires have full cutoff fixtures

B.  

All luminaires are mounted at least three mounting heights from the lighting boundary

C.  

All luminaires have a minimum color temperature of 3500 K

D.  

All luminaires meet acceptable fixture ratings for the project’s Model Lighting Ordinance (MLO) lighting zone

Discussion 0
Question # 106

For Energy and Atmosphere Credit, Advanced Energy Metering, what is the minimum percentage requirement for metering any individual energy end uses?

Options:

A.  

Those that represent 10% or more of the total annual consumption of the building

B.  

Those that represent 25% or more of the total annual consumption of the building

C.  

Those that represent 20% or more of the total annual consumption of the building

D.  

Those that represent 15% or more of the total annual consumption of the building

Discussion 0
Question # 107

Which item is included in the reuse calculation for Materials and Resources Credit, Building Life-Cycle Impact Reduction?

Options:

A.  

Floor decking

B.  

Asbestos insulation

C.  

Exterior glazing

D.  

Plumbing fixtures

Discussion 0
Question # 108

The project team has decided to substitute the flooring in the school gym with natural rubber flooring that has met the Sustainable Agriculture Standard. The cost of the substituted flooring is $80,000. The project will achieve

Options:

A.  

Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials,

Option 2. Leadership Extraction Practices

B.  

Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials,

Option 1. Raw Material Source and Extraction Reporting

C.  

Materials and Resources Credit, Building Product Disclosure and Optimization Environmental Product

Declarations, Option 1. Environmental Product Declarations

D.  

Materials and Resources Credit, Construction and Demolition Waste Management, Option 1. Diversion

Discussion 0
Question # 109

A LEED Building Design and Construction: New Construction office building's HVAC system includes hot water from a central utility plant. The central utility plant is owned and operated by a management company. The office pays a flat fee for hot water, included as part of the lease. The management company does not meter or invoice for actual hot water consumption. For the project to meet the requirements for Energy and Atmosphere Prerequisite, Building-Level

Energy Metering, an energy meter must be installed for

Options:

A.  

natural gas

B.  

hot water at the main service point

C.  

nothing, because the flat fee is included as part of the lease

D.  

nothing, because the energy source is outside of the project's scope

Discussion 0
Question # 110

To achieve SSc6: Light Pollution Reduction using the Backlight, Uplight, and Glare (BUG) Rating Method, projects must demonstrate that all luminaires:

Options:

A.  

Meet acceptable fixture ratings for the project’s Model Lighting Ordinance (MLO) lighting zone

B.  

Have a minimum correlated color temperature of 3,500 K

C.  

Are mounted at least three mounting heights from the lighting boundary

D.  

Are full-cutoff fixtures

Discussion 0