Pre-Winter Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

Free LEED AP Building Design + Construction (LEED v5 AP BD+C) Practice Questions

Exams4sure Dumps

Exam style questions across every LEED-AP-BD+C domain

Last Update 3 days ago
Total Questions : 442

Start with our free LEED-AP-BD+C practice questions, carefully crafted to mirror the domains, phrasing, and difficulty of the real Leadership in Energy and Environmental Design (LEED) exam. Each LEED-AP-BD+C exam question comes with a detailed rationale that explains not just which answer is correct but why the others fall short. That's how concepts stick. Use the free set to benchmark yourself: identify your USGBC weak domains, see where you're losing marks, and build a focused study plan in minutes.

LEED-AP-BD+C PDF

LEED-AP-BD+C PDF (Printable)
$54.25
$154.99

LEED-AP-BD+C Testing Engine

LEED-AP-BD+C PDF (Printable)
$59.5
$169.99

LEED-AP-BD+C PDF + Testing Engine

LEED-AP-BD+C PDF (Printable)
$74.55
$212.99
Question # 101

Which of the following are the major factors determining the total irrigation requirement for a particular landscaping design?

Options:

A.  

Planting density, soil conditions, irrigation efficiency and rainfall

B.  

Relative humidity, site exposure, plant species and planting density

C.  

Plant species, rainfall, evapotranspiration rate, site exposure and irrigation efficiency

D.  

Plant species, rainwater tank size, evapotranspiration rate, site exposure and irrigation efficiency

Discussion 0
Question # 102

A project team compares a life-cycle assessment (LCA) model to a baseline design to determine the reductions in six impact categories. One impact category exceeds the baseline by 7%. Which alternative analyses should the team run to check different impact measurements?

Options:

A.  

Change the orientation of the design case building

B.  

Optimize the slab depth of the design case building

C.  

Decrease the gross floor area of the baseline building

D.  

Increase the wall mass and types of windows in the baseline building

Discussion 0
Question # 103

A large residential building project is exploring strategies to reduce reliance on the municipal water supply. The design must ensure that reused water meets local health and safety standards and remains feasible within the project’s operating budget.

Which of the following considerations should the project team prioritize to effectively implement the water-reuse system while maximizing water efficiency?

Options:

A.  

Install water meters to monitor the use of reclaimed water

B.  

Conduct a feasibility study regarding the availability of alternative water sources on-site

C.  

Assess the energy use of water-treatment technologies

Discussion 0
Question # 104

For an emergency care facility project, which of the following credits can be achieved if the total cost of

permanently installed products are 25% cradle-to-cradle V3 Gold and 25% GreenScreen List Translator?

Options:

A.  

Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 3. Building and Material Reuse & Innovation Credit, Innovation, Exemplary Performance

B.  

Materials and Resources Credit, Furniture and Medical Furnishing, Option 3. Multi-Attribute Assessment ofProducts & Innovation Credit, Innovation, Exemplary Performance

C.  

Materials and Resources Credit, Building Product Disclosure and Optimization, Material Ingredients, Option 2.Material Ingredient Optimization & Innovation Credit, Innovation, Exemplary Performance

D.  

Materials and Resources Credit, Furniture and Medical Furnishings, Option 3. Multi-Attribute Assessment ofProducts & Materials and Resources Credit, Building Product Disclosure and Optimization, Material Ingredients, Option 2. Material Ingredient Optimization

Discussion 0
Question # 105

A new mixed-use development includes residential units and commercial spaces. The project is in an urban area with existing pedestrian paths and public transportation infrastructure. How can the project team minimize exposure to emissions from vehicle traffic around the property while ensuring compliance with LEED strategies?

Options:

A.  

Establish mandatory carpooling arrangements for residents and employees

B.  

Integrate indoor plants to absorb carbon dioxide

C.  

Designate a no-idling zone around the building perimeter

Discussion 0
Question # 106

Under Energy and Atmosphere Credit: Optimize Energy Performance, Option 1: Whole-Building Energy Simulation, how can the energy cost savings be accurately determined?

Options:

Discussion 0
Question # 107

Which approach will contribute to maintaining compliance with Sustainable Sites Credit, Rainwater Management?

Options:

A.  

Installing bioretention area

B.  

Installing on-site renewable power generation facility

C.  

Substituting impervious surface area with high-albedo paving materials

D.  

Increase artificial turf on the roof

Discussion 0
Question # 108

What reference standard is used to determine compliance with the Energy and Atmosphere Prerequisite, Minimum Energy Performance when the whole building energy modeling option is used?

Options:

A.  

ASHRAE 55-2010

B.  

ASHRAE 90.1-2007

C.  

ASHRAE 90.1-2010

D.  

ASHRAE 62.1-2010

Discussion 0
Question # 109

Which federal agency designates Federal Renewal Community sites, which can be considered High Priority Sites for

project development?

Options:

A.  

U.S. Internal Revenue Service

B.  

U.S. Department of Agriculture

C.  

U.S. Environmental Protection Agency

D.  

U.S. Department of Housing and Urban Development

Discussion 0
Question # 110

A project in a cold climate does not want a highly reflective roof because they want the heat absorption. How can this

project comply with Sustainable Sites Credit, Heat Island Reduction?

Options:

A.  

The credit is not feasible for this project

B.  

The credit may be achieved by using nonroof measures only

C.  

The credit is applicable for projects that document this special condition

D.  

The credit can only be achieved by using an alternative compliance path

Discussion 0

Free Exams Sample Questions