Pre-Summer Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

LEED-AP-BD+C LEED AP Building Design + Construction (LEED AP BD+C) is now Stable and With Pass Result | Test Your Knowledge for Free

Exams4sure Dumps

LEED-AP-BD+C Practice Questions

LEED AP Building Design + Construction (LEED AP BD+C)

Last Update 2 days ago
Total Questions : 337

Dive into our fully updated and stable LEED-AP-BD+C practice test platform, featuring all the latest Leadership in Energy and Environmental Design (LEED) exam questions added this week. Our preparation tool is more than just a USGBC study aid; it's a strategic advantage.

Our free Leadership in Energy and Environmental Design (LEED) practice questions crafted to reflect the domains and difficulty of the actual exam. The detailed rationales explain the 'why' behind each answer, reinforcing key concepts about LEED-AP-BD+C. Use this test to pinpoint which areas you need to focus your study on.

LEED-AP-BD+C PDF

LEED-AP-BD+C PDF (Printable)
$43.75
$124.99

LEED-AP-BD+C Testing Engine

LEED-AP-BD+C PDF (Printable)
$50.75
$144.99

LEED-AP-BD+C PDF + Testing Engine

LEED-AP-BD+C PDF (Printable)
$63.7
$181.99
Question # 81

Which of the following documents contains the design team's interpretation of the Owner's Project Requirements?

Options:

A.  

Basis of Design (BOD)

B.  

Simple Box Energy Model Analysis

C.  

System's manual

D.  

Integrated Project Delivery report

Discussion 0
Question # 82

An office is relocating to a new facility. Any furniture that is relocated to the new site can contribute as a reused material for Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials if it was purchased:

Options:

A.  

At least two years prior to the date of project registration

B.  

Within the past five years

C.  

Within two years of the substantial completion of the project

D.  

At least five years prior to the certification of the project

Discussion 0
Question # 83

The LEED AP has identified a pilot credit that is relevant to the project. This would be documented in LEED Online as a(n)

Options:

A.  

Exemplary Performance for a related credit

B.  

Special Circumstances within a related credit

C.  

Regional Priority Credit

D.  

Innovation Credit

Discussion 0
Question # 84

What reference standard is used to determine compliance with the Energy and Atmosphere Prerequisite, Minimum Energy Performance when the whole building energy modeling option is used?

Options:

A.  

ASHRAE 55-2010

B.  

ASHRAE 90.1-2007

C.  

ASHRAE 90.1-2010

D.  

ASHRAE 62.1-2010

Discussion 0
Question # 85

What is the minimum number of members of the integrated project team for the Integrative Process Prerequisite, Integrative Project Planning and Design?

Options:

A.  

One

B.  

Two

C.  

Four

D.  

Six

Discussion 0
Question # 86

Which of the following contributes to the value of the commissioning process?

Options:

A.  

Ensuring that the project budgetary goal is met

B.  

Verifying that the building systems perform as intended

C.  

Verifying that the building water fixtures are installed properly

D.  

Ensuring that the project is delivered to meet the permitting requirements

Discussion 0
Question # 87

A project will renovate a building with historic designation into new office space. The surface area of the existing building structure and envelope is 100,000 ft² (9,290 m²). How much of the existing building will need to be reused to earn 5 points for the Materials and Resource Credit, Building Life-Cycle Impact Reduction?

Options:

A.  

90,000 ft² (8,361 m²)

B.  

There is no minimum

C.  

80,000 ft² (7,432 m²)

D.  

At least 50% of the surface area

Discussion 0
Question # 88

An owner has insisted on using a non-native or non-adapted plant species on both the vegetated roof and ground level. What Sustainable Sites credit will this decision impact the most?

Options:

A.  

Site Development-Protect or Restore Habita

B.  

Site Assessment

C.  

Heat Island Reduction

D.  

Light Pollution Reduction

Discussion 0
Question # 89

A project in a cold climate does not want a highly reflective roof because they want the heat absorption. How can this

project comply with Sustainable Sites Credit, Heat Island Reduction?

Options:

A.  

The credit is not feasible for this project

B.  

The credit may be achieved by using nonroof measures only

C.  

The credit is applicable for projects that document this special condition

D.  

The credit can only be achieved by using an alternative compliance path

Discussion 0
Question # 90

Which of the following is a leadership extraction practice that rewards projects for choosing materials with closed-loop recycling and take-back programs in LEED?

Options:

A.  

Material reuse

B.  

Bio-based elements

C.  

Extended producer responsibility

D.  

Forest Stewardship Council (FSC) wood products