Summer Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

LEED-AP-BD+C LEED AP Building Design + Construction (LEED AP BD+C) is now Stable and With Pass Result | Test Your Knowledge for Free

Exams4sure Dumps

LEED-AP-BD+C Practice Questions

LEED AP Building Design + Construction (LEED AP BD+C)

Last Update 2 days ago
Total Questions : 404

Dive into our fully updated and stable LEED-AP-BD+C practice test platform, featuring all the latest Leadership in Energy and Environmental Design (LEED) exam questions added this week. Our preparation tool is more than just a USGBC study aid; it's a strategic advantage.

Our free Leadership in Energy and Environmental Design (LEED) practice questions crafted to reflect the domains and difficulty of the actual exam. The detailed rationales explain the 'why' behind each answer, reinforcing key concepts about LEED-AP-BD+C. Use this test to pinpoint which areas you need to focus your study on.

LEED-AP-BD+C PDF

LEED-AP-BD+C PDF (Printable)
$54.25
$154.99

LEED-AP-BD+C Testing Engine

LEED-AP-BD+C PDF (Printable)
$59.5
$169.99

LEED-AP-BD+C PDF + Testing Engine

LEED-AP-BD+C PDF (Printable)
$74.55
$212.99
Question # 31

EAp1: Operational Carbon Projection and Decarbonization Plan requires a 25-year forecast. What is the primary purpose of this forecast?

Options:

A.  

Prove that the building will be net-zero energy

B.  

Estimate utility-cost savings to secure project financing

C.  

Map future carbon emissions as the local electrical grid is projected to become cleaner

Discussion 0
Question # 32

For a whole building energy simulation approach, what should be identical for the base building and the proposed building?

Options:

Discussion 0
Question # 33

A rectangular office building is located in an extremely humid climate and is shaded by very large adjacent buildings

on all four sides. If the building owner wants to decrease the annual energy cost for operating the building, which of

the following would be the best design approach?

Options:

A.  

Install glazing with a higher solar heat gain factor

B.  

Install photovoltaic panels on the sides of the building

C.  

Increase outdoor air intake quantities during summer months

D.  

Recover waste energy through exhaust air energy recovery systems

Discussion 0
Question # 34

Which of the following standards is used to perform a Whole-Building Life-Cycle Assessment to measure the Global Warming Potential of materials in LEED projects?

Options:

A.  

ISO 50001:2018

B.  

ISO 14044:2006

C.  

ISO 21930:2017

Discussion 0
Question # 35

Questions 1–5 are based on the same project scenario. Please use the scenario information when answering.

A hospital certified under LEED V5 in 2018 is designing and constructing a 21,000 ft² (1,950.96 m²) vertical addition, plus vegetated terraces and a mechanical penthouse.

The original hospital achieved the Gold certification level and was built with the capacity to add three floors—levels six through eight—to the top of the structure. This addition requires partial demolition of the roof and the floor below.

The project is designed to be architecturally cohesive with the existing building façade and is targeting Platinum certification under LEED v5.

The campus is in a dense urban area adjacent to several bus stops, a light-rail transit station within a 2,500 ft. (762 m) walking distance, and a bicycle docking point at the main entrance to the property. An on-campus shuttle service connects patients, visitors, and staff from the parking areas to each medical building and the light-rail station.

The healthcare campus has existing infrastructure; therefore, no new roads, sidewalks, parking structures, or ground-level landscaping will be installed.

The new floors have separate mechanical systems in the penthouse, but piping for public and patient restrooms, janitor closets, and staff break rooms connects directly to the main hospital plumbing system.

The newly installed medical equipment uses gas, steam, and chilled water supplied by the campus central plant.

Which LEED v5 rating system is appropriate for this project?

Options:

A.  

LEED for New Construction and Major Renovations

B.  

LEED for Commercial Interiors

C.  

LEED for Healthcare

Discussion 0
Question # 36

To achieve the Sustainable Sites Credit, Light Pollution Reduction, Option 1. BUG Rating Method, projects must demonstrate

Options:

A.  

all luminaires have full cutoff fixtures

B.  

all luminaires have a minimum color temperature of 3500 K

C.  

all luminaires meet acceptable fixture ratings for the project's Model Lighting Ordnance (MLO) lighting zone

D.  

all luminaires are mounted at least three mounting heights from the lighting boundary

Discussion 0
Question # 37

A contractor is building a retirement community project. 30% of the building's product costs were derived from reused/salvaged materials or met recycled content criteria. Which of the following credits can the LEED AP submit towards certification?

Options:

A.  

Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials

B.  

Materials and Resources Prerequisite, Construction and Demolition - Waste Management Planning

C.  

Materials and Resources Credit, Building Product Disclosure and Optimization - Material Ingredients

D.  

Materials and Resources Credit, Building Product Disclosure and Optimization - Environmental Product Declarations

Discussion 0
Question # 38

An urban office building project is installing a cooling tower. To save on potable water, the project would like to use a nonpotable water source to provide 20% of the cooling tower makeup water to achieve the maximum number of points under Water Efficiency Credit, Cooling Tower Water Use. Which nonpotable water source would be the most appropriate for use?

Options:

A.  

Municipally supplied tap water

B.  

Ground surface stormwater runoff

C.  

Rainwater collected from the building roof

D.  

Graywater from the building's hand-washing sinks

Discussion 0
Question # 39

What issue must be present on the project site to achieve Location and Transportation Credit, High-Priority Site, Option 3. Brownfield Remediation?

Options:

A.  

Mercury containing lamps

B.  

Contaminated soil or groundwater

C.  

Asphalt construction waste

D.  

Asbestos tile and glue

Discussion 0
Question # 40

A design team pursuing LEED for a new office building project calculated that with the water fixtures specified for the project, a 24% water reduction can be achieved compared to the LEED baseline. What does this mean to the team in terms of pursuing LEED?

Options:

A.  

The project cannot pursue LEED

B.  

The project may pursue Water Efficiency Credit, Indoor Water Use Reduction

C.  

The project does not meet Water Efficiency Prerequisite, Indoor Water Use Reduction, but can make up the points elsewhere in the rating system

D.  

The project can meet the Water Efficiency Prerequisite, Indoor Water Use Reduction, but cannot earn any points under Water Efficiency Credit, Indoor Water Use Reduction

Discussion 0
Get LEED-AP-BD+C dumps and pass your exam in 24 hours!

Free Exams Sample Questions