Pre-Winter Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

Free LEED AP Building Design + Construction (LEED v5 AP BD+C) Practice Questions

Exams4sure Dumps

Exam style questions across every LEED-AP-BD+C domain

Last Update 2 days ago
Total Questions : 442

Start with our free LEED-AP-BD+C practice questions, carefully crafted to mirror the domains, phrasing, and difficulty of the real Leadership in Energy and Environmental Design (LEED) exam. Each LEED-AP-BD+C exam question comes with a detailed rationale that explains not just which answer is correct but why the others fall short. That's how concepts stick. Use the free set to benchmark yourself: identify your USGBC weak domains, see where you're losing marks, and build a focused study plan in minutes.

LEED-AP-BD+C PDF

LEED-AP-BD+C PDF (Printable)
$54.25
$154.99

LEED-AP-BD+C Testing Engine

LEED-AP-BD+C PDF (Printable)
$59.5
$169.99

LEED-AP-BD+C PDF + Testing Engine

LEED-AP-BD+C PDF (Printable)
$74.55
$212.99
Question # 31

A luxury hotel project is in the design phase and is located on a scenic waterfront. It is one point away from attaining LEED Platinum certification. The LEED AP is recommending that the team pursue Innovation Credit, Innovation, Option 3. Additional Strategies. Which of the following credits would be desirable considering the location of the project?

Options:

A.  

Energy and Atmosphere Credit, Optimize Energy Performance, Exemplary Performance

B.  

Indoor Environmental Quality Credit, Quality Views, Exemplary Performance

C.  

Indoor Environmental Quality Credit, Acoustic Performance, Exemplary Performance

D.  

Energy and Atmosphere Credit, Enhanced Commissioning, Exemplary Performance

Discussion 0
Question # 32

In order to comply with Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, Option 2, Additional Enhanced Air Quality Strategies:

Options:

A.  

All entrances to the building must have entryway systems10 ft. (3 m) longin the direction of travel

B.  

All particle filters in the ventilation system must meetComité Européen de Normalisation (CEN) standard Class F7 or better

C.  

CO₂ monitors must be fitted in all densely occupied spaces and configured to provide an alert

D.  

All outdoor air supply systems must have an airflow measurement device that measures at least90% of the airflow

Discussion 0
Question # 33

Which of the following strategies will aid in reducing indoor water use?

Options:

A.  

Design drip irrigation for landscape

B.  

Use high-efficiency HVAC systems

C.  

Exclude janitor closets in the building

D.  

Optimize consumption of showerheads

Discussion 0
Question # 34

Which of the following project team members should be integrated early into the design phase to assist with earning the Materials and Resources Prerequisite, Construction and Demolition Waste Management Planning?

Options:

A.  

Owner

B.  

Contractor

C.  

Occupants

D.  

Facility manager

Discussion 0
Question # 35

Which would contribute to compliance with Sustainable Sites Credit, Open Space?

Options:

A.  

A mall with an indoor atrium, featuring a reflective roof

B.  

A parking lot that serves as the location for a monthly flea market

C.  

An intensive vegetated roof, provided the building has at least a 1.0 Floor to Area Ratio (FAR)

D.  

A forested area containing nature trails, that also achieves Sustainable Sites Credit, Site Development – Protect or Restore Habitat

Discussion 0
Question # 36

Under Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification, a current facilities requirements and operations and maintenance plan must contain which information necessary to operate the building efficiently?

Options:

A.  

Any changes in schedules or setpoints for different seasons, days of the week, and times of day

B.  

Only changes in schedules or setpoints for peak usages during seasons, days of the week, and times of day

C.  

Any changes in schedules during peak times, or for different seasons, peak-usage days of the week, and times of day

D.  

Any changes in schedules or setpoints focusing on only the hottest and coldest periods of the seasons, peak-use days of the week, and times of day

Discussion 0
Question # 37

A comprehensive rainwater management plan may include design elements such as

Options:

A.  

artificial turf, bioretention pond, cisterns and hay bales

B.  

cisterns, porous pavement, swales and vegetated roofs

C.  

soil compaction, swales, vegetated roofs and xeriscaping

D.  

bioretention pond, cisterns, porous pavement and stabilized construction entrance

Discussion 0
Question # 38

A project team is using the whole building simulation model to quantify the percentage of energy savings for the project. Which of the following should remain the same for both the baseline building and the proposed building?

Options:

A.  

Building operating schedule and occupancy hours

B.  

Building operating schedule and total window area

C.  

Building envelope construction and occupancy hours

D.  

Total window area and building envelope construction

Discussion 0
Question # 39

A hospital certified underLEED V5in 2018 is designing and constructing a 21,000 ft² (1,950.96 m²) vertical addition, plus vegetated terraces and a mechanical penthouse.

The original hospital achieved the Gold certification level and was built with the capacity to add three floors—levels six through eight—to the top of the structure. This addition requires partial demolition of the roof and the floor below.

The project is designed to be architecturally cohesive with the existing building façade and is targeting Platinum certification under LEED v5.

The campus is in a dense urban area adjacent to several bus stops, a light-rail transit station within a 2,500 ft. (762 m) walking distance, and a bicycle docking point at the main entrance to the property. An on-campus shuttle service connects patients, visitors, and staff from the parking areas to each medical building and the light-rail station.

The healthcare campus has existing infrastructure; therefore, no new roads, sidewalks, parking structures, or ground-level landscaping will be installed.

The new floors have separate mechanical systems in the penthouse, but piping for public and patient restrooms, janitor closets, and staff break rooms connects directly to the main hospital plumbing system.

The newly installed medical equipment uses gas, steam, and chilled water supplied by the campus central plant.

Based on the project design and the credit options that the project team may attempt, what is the highest LEED certification level that can be achieved?

Options:

A.  

Platinum

B.  

Gold

C.  

Silver

Discussion 0
Question # 40

Which of the following strategies can be used to decrease the envelope load of a building?

Options:

A.  

Provide summer solar shading

B.  

Maximize daylighting

C.  

Decrease opaque wall area

D.  

Use economizers for free cooling

Discussion 0

Free Exams Sample Questions