Summer Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

LEED-AP-BD+C LEED AP Building Design + Construction (LEED AP BD+C) is now Stable and With Pass Result | Test Your Knowledge for Free

Exams4sure Dumps

LEED-AP-BD+C Practice Questions

LEED AP Building Design + Construction (LEED AP BD+C)

Last Update 2 days ago
Total Questions : 404

Dive into our fully updated and stable LEED-AP-BD+C practice test platform, featuring all the latest Leadership in Energy and Environmental Design (LEED) exam questions added this week. Our preparation tool is more than just a USGBC study aid; it's a strategic advantage.

Our free Leadership in Energy and Environmental Design (LEED) practice questions crafted to reflect the domains and difficulty of the actual exam. The detailed rationales explain the 'why' behind each answer, reinforcing key concepts about LEED-AP-BD+C. Use this test to pinpoint which areas you need to focus your study on.

LEED-AP-BD+C PDF

LEED-AP-BD+C PDF (Printable)
$54.25
$154.99

LEED-AP-BD+C Testing Engine

LEED-AP-BD+C PDF (Printable)
$59.5
$169.99

LEED-AP-BD+C PDF + Testing Engine

LEED-AP-BD+C PDF (Printable)
$74.55
$212.99
Question # 1

Which of the following cannot be classified as graywater?

Options:

A.  

Water from toilets

B.  

Water from showers

C.  

Water from kitchen sinks

D.  

Water from lavatory faucets

Discussion 0
Question # 2

A developer is building a new shopping mall in a temperate climate. The developer wants to reduce operating costs and improve occupant experience. Which design scheme should the project team present?

Options:

A.  

A design that increases peak thermal loads in the office and administrative spaces

B.  

A design that reduces the overall parking footprint and provides preferred parking for electric-vehicle charging

C.  

A design with a narrow floor plate that maximizes daylight in retail areas and minimizes the need for electric lighting

D.  

A design with a large roof that collects rainwater to reduce stormwater runoff

Discussion 0
Question # 3

Which of the following statements is correct when defining the project boundary?

Options:

A.  

The LEED project boundary cannot include non-contiguous land

B.  

The LEED project boundary cannot include more than one building

C.  

The land associated with the project supports typical operation

D.  

The gross floor area of the LEED project should be no less than 1% of the gross land area within the LEED project boundary

Discussion 0
Question # 4

What percentage of all energy usage is attributable to buildings?

Options:

A.  

60%

B.  

30%

C.  

40%

D.  

50%

Discussion 0
Question # 5

Which of the following descriptions defines an Environmental Product Declaration (EPD) in the context of MRc4: Building Product Selection and Procurement?

Options:

A.  

A third-party certification that guarantees a product is free of harmful chemicals and pollutants

B.  

A verified document that provides transparent and standardized information about a product’s environmental impacts

C.  

A self-declared statement regarding a material’s recycled content and manufacturing process

Discussion 0
Question # 6

When the LEED AP is applying the Integrative Process to a Building Design and Construction project, which of the following information is required to be present in the Owner's Project Requirements (OPR)?

Options:

A.  

All applicable codes and standards

B.  

Interior finishes related to the project

C.  

All project team members and applicable roles

D.  

Energy efficiency goals and training requirements

Discussion 0
Question # 7

A decorative overhead light fixture is specified for a project that costs $1,500 USD and uses recycled water bottles as part of the diffuser shade. The shades are 10% of the overall weight of the fixture and are 50% post-consumer recycled content. Assuming no other portions of the fixture meet sustainability criteria, what would the contributing value of the fixture be?

Options:

A.  

$75

B.  

$150

C.  

$750

D.  

$1,500

Discussion 0
Question # 8

When the project occupancy is not known, which method is recommended?

Options:

A.  

Default occupant density from ASHRAE 62.1-2010, Table 6-1

B.  

Default occupant density from ASHRAE 90.1-2010, Table G3.1.1A

C.  

Weekly average taken into account all the occupants in a typical 24-hour day of operation

D.  

Occupancy measured for eight hours, between 8 a.m. and 5 p.m., for all occupancy patterns

Discussion 0
Question # 9

The material cost for a project is $100,000. What is the minimum material value needed to achieve Materials and Resources Credit, Building Disclosure and Optimization, Sourcing of Raw Materials, Option 2. Leadership Extraction

Practices?

Options:

A.  

$10,000

B.  

$12,500

C.  

$22,500

D.  

$25,000

Discussion 0
Question # 10

For Energy and Atmosphere Credit, Advanced Energy Metering, what is the minimum amount of time that the metering system should store data?

Options:

A.  

6 months

B.  

12 months

C.  

24 months

D.  

36 months

Discussion 0