Pre-Winter Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

Free LEED AP Building Design + Construction (LEED v5 AP BD+C) Practice Questions

Exams4sure Dumps

Exam style questions across every LEED-AP-BD+C domain

Last Update 2 days ago
Total Questions : 442

Start with our free LEED-AP-BD+C practice questions, carefully crafted to mirror the domains, phrasing, and difficulty of the real Leadership in Energy and Environmental Design (LEED) exam. Each LEED-AP-BD+C exam question comes with a detailed rationale that explains not just which answer is correct but why the others fall short. That's how concepts stick. Use the free set to benchmark yourself: identify your USGBC weak domains, see where you're losing marks, and build a focused study plan in minutes.

LEED-AP-BD+C PDF

LEED-AP-BD+C PDF (Printable)
$54.25
$154.99

LEED-AP-BD+C Testing Engine

LEED-AP-BD+C PDF (Printable)
$59.5
$169.99

LEED-AP-BD+C PDF + Testing Engine

LEED-AP-BD+C PDF (Printable)
$74.55
$212.99
Question # 11

Which of the following strategies can increase the climate resilience of a project during site-specific natural hazard events?

Options:

A.  

Enhancing roof insulation

B.  

Utilizing drought-tolerant landscaping

C.  

Increasing indoor ventilation rates

Discussion 0
Question # 12

What stage of LEED for Neighborhood Development certification listed below is eligible for points under Building Design and Construction: New Construction, Location and Transportation Credit, LEED for Neighborhood Development Location?

Options:

A.  

LEED V5, LEED for Neighborhood Development Conditional Approval

B.  

LEED for Neighborhood Development Pilot, Stage 3 LEED for Neighborhood Development Certified Project

C.  

LEED for Neighborhood Development Pilot, Stage 1 LEED for Neighborhood Development Pre-reviewed Plan

D.  

LEED 2009, Stage 1 Conditional Approval of LEED for Neighborhood Development Plan

Discussion 0
Question # 13

For Location and Transportation Credit, Access to Quality Transit, a project team preparing timetables and service-level documentation must ensure the materials include

Options:

A.  

verification that a weighted daily average has been used for each qualifying route

B.  

confirmation that functional entries of the project are within 3/4 mi. (1.20 km) of the stop

C.  

verification that a weighted building average has been used for each qualifying functional entry

D.  

confirmation that each qualifying route features paired route service (service in opposite directions)

Discussion 0
Question # 14

What is a benefit of including the public in a charrette for a new school before the pre-design phase?

Options:

A.  

Neighbors can plan for future construction

B.  

It will help streamline the permitting process

C.  

Potential partnerships with the community can be revealed

D.  

The owner can determine financial strategies based on the public ' s input

Discussion 0
Question # 15

Which of the following statements is correct when defining the project boundary?

Options:

A.  

The LEED project boundary cannot include non-contiguous land

B.  

The LEED project boundary cannot include more than one building

C.  

The land associated with the project supports typical operation

D.  

The gross floor area of the LEED project should be no less than 1% of the gross land area within the LEED project boundary

Discussion 0
Question # 16

A new facility has a comprehensive advanced energy metering system that measures energy consumption across multiple subsystems. The facilities manager aims to use this data to enhance energy management practices and improve overall building performance.

The facilities manager can utilize the advanced energy metering system to optimize energy use and reduce costs in the new student center by:

Options:

A.  

Adjusting the setpoints of the HVAC system based solely on outdoor temperature changes

B.  

Using automated alerts from the metering system to address sudden spikes in energy use

C.  

Scheduling regular audits for all installed lighting systems to ensure compatibility with energy meters

Discussion 0
Question # 17

A project team is considering implementing a strategy that has previously been awarded as an Innovation credit on another project. Which actions should be followed if the project team wishes to gain formal pre-approval of the same strategy on the new project?

Options:

A.  

Consult the LEED Administrator for the previous project

B.  

Submit a Project Credit Interpretation Request (CIR) to GBCI

C.  

Submit to Green Business Certification Inc. (GBCI) as-is

D.  

The project is ineligible for an Innovation credit

Discussion 0
Question # 18

What is the minimum number of members of the integrated project team for the Integrative Process Prerequisite, Integrative Project Planning and Design?

Options:

A.  

One

B.  

Two

C.  

Four

D.  

Six

Discussion 0
Question # 19

The energy-related systems analysis for Integrative Process credit for Core and Shell projects should include all system loads and occupants required by which Energy and Atmosphere prerequisite?

Options:

A.  

Building-level energy metering

B.  

Fundamental commissioning and verification

C.  

Minimum energy performance

D.  

Fundamental refrigerant management

Discussion 0
Question # 20

A hospital certified underLEED V5in 2018 is designing and constructing a 21,000 ft² (1,950.96 m²) vertical addition, plus vegetated terraces and a mechanical penthouse.

The original hospital achieved the Gold certification level and was built with the capacity to add three floors—levels six through eight—to the top of the structure. This addition requires partial demolition of the roof and the floor below.

The project is designed to be architecturally cohesive with the existing building façade and is targeting Platinum certification under LEED v5.

The campus is in a dense urban area adjacent to several bus stops, a light-rail transit station within a 2,500 ft. (762 m) walking distance, and a bicycle docking point at the main entrance to the property. An on-campus shuttle service connects patients, visitors, and staff from the parking areas to each medical building and the light-rail station.

The healthcare campus has existing infrastructure; therefore, no new roads, sidewalks, parking structures, or ground-level landscaping will be installed.

The new floors have separate mechanical systems in the penthouse, but piping for public and patient restrooms, janitor closets, and staff break rooms connects directly to the main hospital plumbing system.

The newly installed medical equipment uses gas, steam, and chilled water supplied by the campus central plant.

Based on the project description, which of the following credits can be achieved with all available points awarded?

Options:

A.  

LTc3: Compact and Connected Development

B.  

EAc1: Electrification

C.  

WEc2: Enhanced Water Efficiency

Discussion 0

Free Exams Sample Questions