Pre-Winter Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

Free LEED AP Building Design + Construction (LEED v5 AP BD+C) Practice Questions

Exams4sure Dumps

Exam style questions across every LEED-AP-BD+C domain

Last Update 2 days ago
Total Questions : 442

Start with our free LEED-AP-BD+C practice questions, carefully crafted to mirror the domains, phrasing, and difficulty of the real Leadership in Energy and Environmental Design (LEED) exam. Each LEED-AP-BD+C exam question comes with a detailed rationale that explains not just which answer is correct but why the others fall short. That's how concepts stick. Use the free set to benchmark yourself: identify your USGBC weak domains, see where you're losing marks, and build a focused study plan in minutes.

LEED-AP-BD+C PDF

LEED-AP-BD+C PDF (Printable)
$54.25
$154.99

LEED-AP-BD+C Testing Engine

LEED-AP-BD+C PDF (Printable)
$59.5
$169.99

LEED-AP-BD+C PDF + Testing Engine

LEED-AP-BD+C PDF (Printable)
$74.55
$212.99
Question # 21

Which of the following ventilation strategies is essential for maintaining acceptable indoor air quality while balancing energy use?

Options:

A.  

Natural ventilation through operable windows

B.  

Mechanical ventilation with heat recovery

C.  

Underfloor air-distribution systems

Discussion 0
Question # 22

A project team is attempting Location and Transportation Credit, High Priority Site, and selects Option 1: Historic District. To demonstrate that the project is in an infill site, the project team must confirm that:

Options:

A.  

At least75% of qualifying land areas within ¾ mile (1.20 km)are previously developed

B.  

At least75% of qualifying land areas within ½ mile (0.80 km)are previously developed

C.  

The site is a brownfield as defined by the Environmental Protection Agency (EPA)

D.  

The project is a Federal Renewal Community site

Discussion 0
Question # 23

Which of the following features is commonly included in a building’s leak-detection system to enhance water efficiency?

Options:

A.  

Real-time monitoring and alerts

B.  

Water-use prediction algorithms based on weather data

C.  

Monthly water-use analysis reports

Discussion 0
Question # 24

The project needs to attempt WEp2: Minimum Water Efficiency. Which combination of process water, appliances, and flush/flow fixtures should the project show compliance for?

Options:

A.  

Janitor sinks, kitchen dishwashers, toilets, and lavatories

B.  

Pool water, ice maker, lavatories, and showers

C.  

Showers, kitchen sinks, toilets, and cooling towers

Discussion 0
Question # 25

Which of the following Materials and Resources credits or prerequisites is reviewed under the design phase documentation submission?

Options:

A.  

PBT Source Reduction - Lead, Cadmium, and Copper

B.  

PBT Source Reduction - Mercury

C.  

Building Product Disclosure and Optimization - Environmental Product Declarations

D.  

Building Product Disclosure and Optimization - Sourcing of Raw Materials

Discussion 0
Question # 26

Which rating system is appropriate for a new mixed-use building with 300,000 ft2 (27 871 m2) of residential units, 150,000 ft2 (13 935 m2) hotel and 50,000 ft2 (4 645 m2) of retail space?

Options:

A.  

Retail

B.  

Hospitality

C.  

Core and Shell Development

D.  

New Construction

Discussion 0
Question # 27

The design team is attempting to achieve the Increased Ventilation strategy in the Indoor Environmental Quality Credit, Enhanced Indoor Air Quality in a conference room. The associated ASHRAE standard requires 400 CFM (11.3 CMM) of ventilation air, but the local code requires 500 CFM (14.1 CMM) of ventilation air. What is the required minimum amount of ventilation air to achieve this credit?

Options:

A.  

650 CFM (18.4 CMM)

B.  

500 CFM (14.1 CMM)

C.  

400 CFM (11.3 CMM)

D.  

520 CFM (14.7 CMM)

Discussion 0
Question # 28

According to LEED guidelines, which of the following project types should utilize the LEED BD+C rating system?

Options:

A.  

A museum with extensive renovations that requires a new certificate of occupancy

B.  

An apartment complex undergoing extensive repairs that affects a majority of the interior layout

C.  

A theater with updated mechanical systems that retains its original structural components

Discussion 0
Question # 29

Which of the following contributes to the value of the commissioning process?

Options:

A.  

Ensuring that the project budgetary goal is met

B.  

Verifying that the building systems perform as intended

C.  

Verifying that the building water fixtures are installed properly

D.  

Ensuring that the project is delivered to meet the permitting requirements

Discussion 0
Question # 30

What is the first step to earn the Water Efficiency Credit, Cooling Tower Water Use?

Options:

A.  

Select air-conditioner condensate for cooling

B.  

Calculate cycles of concentration

C.  

Identify the maximum number of cycles for the cooling tower or evaporative condenser

D.  

Engage a water treatment professional to perform a chemical analysis

Discussion 0

Free Exams Sample Questions