Pre-Summer Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

LEED-AP-BD+C LEED AP Building Design + Construction (LEED AP BD+C) is now Stable and With Pass Result | Test Your Knowledge for Free

Exams4sure Dumps

LEED-AP-BD+C Practice Questions

LEED AP Building Design + Construction (LEED AP BD+C)

Last Update 2 days ago
Total Questions : 337

Dive into our fully updated and stable LEED-AP-BD+C practice test platform, featuring all the latest Leadership in Energy and Environmental Design (LEED) exam questions added this week. Our preparation tool is more than just a USGBC study aid; it's a strategic advantage.

Our free Leadership in Energy and Environmental Design (LEED) practice questions crafted to reflect the domains and difficulty of the actual exam. The detailed rationales explain the 'why' behind each answer, reinforcing key concepts about LEED-AP-BD+C. Use this test to pinpoint which areas you need to focus your study on.

LEED-AP-BD+C PDF

LEED-AP-BD+C PDF (Printable)
$43.75
$124.99

LEED-AP-BD+C Testing Engine

LEED-AP-BD+C PDF (Printable)
$50.75
$144.99

LEED-AP-BD+C PDF + Testing Engine

LEED-AP-BD+C PDF (Printable)
$63.7
$181.99
Question # 21

Sustainable Sites Credit, Site Assessment requires evaluation of

Options:

A.  

soils, archeology, hydrology

B.  

topography, hydrology, human use

C.  

vegetation, topography, archaeology

D.  

human health effects, climate, land value

Discussion 0
Question # 22

A new athletic facility contains a laundry room which is adjacent to the locker rooms. Which strategy will contribute toward the Interior Cross-Contamination Prevention strategy in Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies?

Options:

A.  

Relocate the laundry facility to the basement

B.  

Naturally ventilate the laundry space per ASHRAE 62.1-2010

C.  

Install particle filters, with a MERV of 13 or higher or F7

D.  

Provide a ventilation system specifically for the laundry facility that has no recirculating air

Discussion 0
Question # 23

Smoking is prohibited inside LEED-certified buildings in order to eliminate the health risks associated with environmental tobacco smoke. Which building type is exempt from this requirement?

Options:

A.  

Office projects

B.  

Healthcare projects

C.  

Warehouse projects

D.  

Residential projects

Discussion 0
Question # 24

During a design charrette, community neighbors raise a concern about potential glare resulting from a project's highly reflective roof. Which change should the LEED AP recommend to best address these concerns without negatively impacting other LEED credits?

Options:

A.  

Change the design to incorporate rooftop solar panels

B.  

Change the roofing material to a dark material to eliminate the issue

C.  

Change the design to reduce the amount of roofing area

D.  

Change the design to include a vegetative roofing system

Discussion 0
Question # 25

A contractor is building a retirement community project. 30% of the building's product costs were derived from reused/salvaged materials or met recycled content criteria. Which of the following credits can the LEED AP submit towards certification?

Options:

A.  

Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials

B.  

Materials and Resources Prerequisite, Construction and Demolition - Waste Management Planning

C.  

Materials and Resources Credit, Building Product Disclosure and Optimization - Material Ingredients

D.  

Materials and Resources Credit, Building Product Disclosure and Optimization - Environmental Product Declarations

Discussion 0
Question # 26

When measuring sound pressure levels in a classroom to determine compliance with the HVAC background noise requirements of LEED Building Design and Construction: Schools, Indoor Environmental Quality Prerequisite, Minimum Acoustic Performance, what testing conditions are appropriate for the classroom?

Options:

A.  

Furnished, teacher speaking, HVAC operating at maximum flow rates

B.  

Unfurnished, teacher speaking, HVAC operating at typical level

C.  

Furnished, no occupants, HVAC operating at typical level

D.  

Unfurnished, no occupants, HVAC operating at maximum flow rates

Discussion 0
Question # 27

The owner of a large multi-building property is seeking LEED certification. In determining the LEED project boundaries the LEED AP may include non-contiguous parcels of land if

Options:

A.  

the parcels are used for temporary uses such as parking or staging that is owned and managed by a third party

B.  

the parcels directly support or are associated with normal building operations and are accessible to the project's occupants

C.  

the parcels are part of an existing public preservation easement or resource protection area that is directly adjacent to the LEED project boundary

D.  

the parcels are part of a land trust or conservation organization for which the LEED project provides financial support for in the Sustainable Sites Credit, Site Development Credit, Protect or Restore Habitat, Option 2. Financial Support

Discussion 0
Question # 28

When preparing the Sustainable Sites Prerequisite, Construction Activity Pollution Prevention, the Construction General Permit must contain which of the following?

Options:

A.  

Waste Management Plan

B.  

Building orientation on the site

C.  

Installation plan for perimeter control

D.  

Minimum standards for equipment exhaust

Discussion 0
Question # 29

A rectangular office building is located in an extremely humid climate and is shaded by very large adjacent buildings

on all four sides. If the building owner wants to decrease the annual energy cost for operating the building, which of

the following would be the best design approach?

Options:

A.  

Install glazing with a higher solar heat gain factor

B.  

Install photovoltaic panels on the sides of the building

C.  

Increase outdoor air intake quantities during summer months

D.  

Recover waste energy through exhaust air energy recovery systems

Discussion 0
Question # 30

Which of the following project team members should be integrated early into the design phase to assist with earning the Materials and Resources Prerequisite, Construction and Demolition Waste Management Planning?

Options:

A.  

Owner

B.  

Contractor

C.  

Occupants

D.  

Facility manager

Discussion 0