Summer Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

LEED-AP-BD+C LEED AP Building Design + Construction (LEED AP BD+C) is now Stable and With Pass Result | Test Your Knowledge for Free

Exams4sure Dumps

LEED-AP-BD+C Practice Questions

LEED AP Building Design + Construction (LEED AP BD+C)

Last Update 2 days ago
Total Questions : 404

Dive into our fully updated and stable LEED-AP-BD+C practice test platform, featuring all the latest Leadership in Energy and Environmental Design (LEED) exam questions added this week. Our preparation tool is more than just a USGBC study aid; it's a strategic advantage.

Our free Leadership in Energy and Environmental Design (LEED) practice questions crafted to reflect the domains and difficulty of the actual exam. The detailed rationales explain the 'why' behind each answer, reinforcing key concepts about LEED-AP-BD+C. Use this test to pinpoint which areas you need to focus your study on.

LEED-AP-BD+C PDF

LEED-AP-BD+C PDF (Printable)
$54.25
$154.99

LEED-AP-BD+C Testing Engine

LEED-AP-BD+C PDF (Printable)
$59.5
$169.99

LEED-AP-BD+C PDF + Testing Engine

LEED-AP-BD+C PDF (Printable)
$74.55
$212.99
Question # 21

One point can be achieved through Sustainable Sites Credit, Heat Island Reduction by providing:

Options:

A.  

Preferred parking for green vehicles

B.  

A minimum of 75% of parking spaces under cover

C.  

Access to public transportation stops

D.  

A roof with artificial turf grass

Discussion 0
Question # 22

Which strategy can maximize the efficiency of water use in an irrigation system?

Options:

A.  

Determine a set rate of irrigation and avoid adjustments

B.  

Set the irrigation controllers on a timer

C.  

Incorporate precipitation sensors with smart irrigation controllers

D.  

Space irrigation sprinkler heads for overlapping coverage

Discussion 0
Question # 23

The LEED project has a main entrance and two service entrances in an alley behind the building. Which entrances need non-smoking signage and at what maximum distance from the door(s) can the non-smoking signage be posted?

Options:

A.  

At the main entrance, 10 ft. (3 m) from the door

B.  

At the main entrance, 25 ft. (7.5 m) from the door

C.  

At the main entrance and the two service entrances, 10 ft. (3 m) from the doors

D.  

At the main entrance and the two service entrances, 25 ft. (7.5 m) from the doors

Discussion 0
Question # 24

The project team wants to modify the design of an office building copy room to minimize the risk of airborne contamination to the surrounding space. The design includes a separate exhaust, but due to design constraints the partition walls of the room cannot run deck-to-deck. What can the team do to achieve Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies?

Options:

A.  

Use MERV 8 (F5), or higher, filters

B.  

Provide a hard-lid ceiling

C.  

Create positive pressure in the room

D.  

Provide a large opening to dilute air contaminates

Discussion 0
Question # 25

How can a building owner promote both energy efficiency and thermal comfort in a building?

Options:

A.  

Survey occupants about their comfort on a regular basis

B.  

Provide occupants with individual space heaters in the winter

C.  

Ask the cleaning contractor to turn off all of the lights after cleaning

D.  

Institute a flexible dress code that permits seasonally appropriate clothing

Discussion 0
Question # 26

What is the definition of the evapotranspiration rate?

Options:

A.  

Evaporation of onsite reuse water

B.  

Percentage of potable water usage for irrigation

C.  

Water loss from evaporation in micro irrigation systems

D.  

Amount of water loss in a vegetated surface in units of water depth

Discussion 0
Question # 27

In the Indoor Environmental Quality Credit, Low-Emitting Materials, what types of products need to be evaluated for

both Volatile Organic Compound (VOC) content of the material and VOC emissions of the material?

Options:

A.  

Flooring

B.  

Furniture

C.  

Composite wood

D.  

Wet applied products

Discussion 0
Question # 28

For a new project with a $10 million construction cost, the weight of the total recycled content is 0.9 tons (816.5 kilograms) each for post-consumer and pre-consumer recycled content. The value of the total recycled content is one million each for post-consumer and pre-consumer recycled content. What is the percentage of recycled content that contributes toward Materials and Resources Credit: Building Product Disclosure and Optimization - Sourcing of Raw Materials, Option 2, Leadership Extraction Practices?

Options:

A.  

33%

B.  

20%

C.  

40%

D.  

18%

Discussion 0
Question # 29

Which of the following features is commonly included in a building’s leak-detection system to enhance water efficiency?

Options:

A.  

Real-time monitoring and alerts

B.  

Water-use prediction algorithms based on weather data

C.  

Monthly water-use analysis reports

Discussion 0
Question # 30

According to the Integrative Process Credit, the discovery phase of energy-related systems should identify

Options:

A.  

ventilation rates

B.  

functional performance tests

C.  

thermal comfort ranges

D.  

transportation options

Discussion 0
Get LEED-AP-BD+C dumps and pass your exam in 24 hours!

Free Exams Sample Questions