Pre-Winter Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

Free LEED AP Building Design + Construction (LEED v5 AP BD+C) Practice Questions

Exams4sure Dumps

Exam style questions across every LEED-AP-BD+C domain

Last Update 2 days ago
Total Questions : 442

Start with our free LEED-AP-BD+C practice questions, carefully crafted to mirror the domains, phrasing, and difficulty of the real Leadership in Energy and Environmental Design (LEED) exam. Each LEED-AP-BD+C exam question comes with a detailed rationale that explains not just which answer is correct but why the others fall short. That's how concepts stick. Use the free set to benchmark yourself: identify your USGBC weak domains, see where you're losing marks, and build a focused study plan in minutes.

LEED-AP-BD+C PDF

LEED-AP-BD+C PDF (Printable)
$54.25
$154.99

LEED-AP-BD+C Testing Engine

LEED-AP-BD+C PDF (Printable)
$59.5
$169.99

LEED-AP-BD+C PDF + Testing Engine

LEED-AP-BD+C PDF (Printable)
$74.55
$212.99
Question # 51

What requirements are needed to earn Regional Priority credits?

Options:

A.  

Full name and specialty credential of LEED AP

B.  

Points are awarded automatically

C.  

Exemplary performance

D.  

Related credits registration

Discussion 0
Question # 52

A project team wants to educate the facility manager on the installed building systems to improve Indoor Environmental Quality. They want the facility manager to maintain the systems so that they will continue to function as intended. Which of the following should be provided to the facility manager?

Options:

A.  

Vendor invoices for mechanical equipment

B.  

Preventive maintenance plan for the building

C.  

As-built drawings and copies of material submittals

D.  

A copy of the credit documentation for the credits that were approved by Green Business Certification Inc. (GBCI)

Discussion 0
Question # 53

The Sustainable Sites Credit, Heat Island Reduction takes into account both new and three-year aged Solar Reflectance Index (SRI) values for roofing material because

Options:

A.  

SRI generally increases with age

B.  

SRI generally decreases with age

C.  

SRI generally remains the same with age

D.  

SRI generally does not impact the Heat Island Effect

Discussion 0
Question # 54

Operable windows contribute to resilient planning and design in extreme climate conditions by:

Options:

A.  

Increasing the thermal mass of the building for heat retention

B.  

Allowing natural ventilation to improve indoor air quality

C.  

Facilitating seasonal thermal adaptation for occupants

Discussion 0
Question # 55

A mixed-use development project located in an urban area includes office spaces, retail shops, and residential units. Which of the following actions should the project team consider to improve the sustainable transportation strategies for this development?

Options:

A.  

Reduce the total number of parking spaces in alignment with local regulations

B.  

Implement an educational campaign about the benefits of public transportation

C.  

Integrate public transportation subsidies for residents

Discussion 0
Question # 56

The project landscape architect suggests reducing the area planned for surface parking and replacing it with additional vegetated space. What benefit would this strategy provide to the owner?

Options:

A.  

Increases the rainwater infiltration capacity

B.  

Decreases the amount of bicycle parking that must be provided

C.  

Increases the overall SR (solar reflectance) of the hardscape area

D.  

Decreases the required amount of on-street parking that must be provided

Discussion 0
Question # 57

A project ' s total site area is 240,000 ft2 (22 297 m2) and the building footprint is 40,000 ft2 (3 716 m2). How much

outdoor space and vegetated space must it provide to earn Sustainable Sites Credit, Open Space?

Options:

A.  

60,000 ft2 (5 574 m2) of outdoor space of which 15,000 ft2 (1 394 m2) must be vegetated

B.  

60,000 ft2 (5 574 m2) of outdoor space of which 50,000 ft2 (4 645 m2) must be vegetated

C.  

72,000 ft2 (6 689 m2) of outdoor space of which 18,000 ft2 (1 672 m2) must be vegetated

D.  

72,000 ft2 (6 689 m2) of outdoor space of which 60,000 ft2 (5 574 m2) must be vegetated

Discussion 0
Question # 58

When required to measure residential and non-residential densities, Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 1. Surrounding Density requires project teams to measure the residential and non-residential densities in what way?

Options:

A.  

Measure densities within a¼ mile (0.40 km) radiusof the project boundary

B.  

Measure densities within a¾ mile (1.20 km) radiusof the project boundary

C.  

Measure densities within a⅓ mile (0.53 km) radiusof the project boundary

D.  

Measure densities within a½ mile (0.80 km) radiusof the project boundary

Discussion 0
Question # 59

A hospital certified underLEED V5in 2018 is designing and constructing a 21,000 ft² (1,950.96 m²) vertical addition, plus vegetated terraces and a mechanical penthouse.

The original hospital achieved the Gold certification level and was built with the capacity to add three floors—levels six through eight—to the top of the structure. This addition requires partial demolition of the roof and the floor below.

The project is designed to be architecturally cohesive with the existing building façade and is targeting Platinum certification under LEED v5.

The campus is in a dense urban area adjacent to several bus stops, a light-rail transit station within a 2,500 ft. (762 m) walking distance, and a bicycle docking point at the main entrance to the property. An on-campus shuttle service connects patients, visitors, and staff from the parking areas to each medical building and the light-rail station.

The healthcare campus has existing infrastructure; therefore, no new roads, sidewalks, parking structures, or ground-level landscaping will be installed.

The new floors have separate mechanical systems in the penthouse, but piping for public and patient restrooms, janitor closets, and staff break rooms connects directly to the main hospital plumbing system.

The newly installed medical equipment uses gas, steam, and chilled water supplied by the campus central plant.

In addition to the vegetated terraces, the project team is considering installing a green roof with walkways, fountains, and seating areas for patients, visitors, and staff. If the project attempts SSc2: Accessible Outdoor Space, what percentage of the required outdoor space must be vegetated?

Options:

A.  

20%

B.  

25%

C.  

30%

Discussion 0
Question # 60

A building in a rural area with an FAR of 1.7 is planning to pursue a point under SSc2: Accessible Outdoor Space. Which of the following criteria will help the project achieve the credit?

Options:

A.  

Driveways designed with paver blocks

B.  

A space dedicated to community gardens

C.  

Covered car park

D.  

A permanent and secure bicycle repair station

Discussion 0

Free Exams Sample Questions