Pre-Winter Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

Free LEED AP Building Design + Construction (LEED v5 AP BD+C) Practice Questions

Exams4sure Dumps

Exam style questions across every LEED-AP-BD+C domain

Last Update 3 days ago
Total Questions : 442

Start with our free LEED-AP-BD+C practice questions, carefully crafted to mirror the domains, phrasing, and difficulty of the real Leadership in Energy and Environmental Design (LEED) exam. Each LEED-AP-BD+C exam question comes with a detailed rationale that explains not just which answer is correct but why the others fall short. That's how concepts stick. Use the free set to benchmark yourself: identify your USGBC weak domains, see where you're losing marks, and build a focused study plan in minutes.

LEED-AP-BD+C PDF

LEED-AP-BD+C PDF (Printable)
$54.25
$154.99

LEED-AP-BD+C Testing Engine

LEED-AP-BD+C PDF (Printable)
$59.5
$169.99

LEED-AP-BD+C PDF + Testing Engine

LEED-AP-BD+C PDF (Printable)
$74.55
$212.99
Question # 111

Within the Indoor Environmental Quality credit category, which of the following design strategies can be used to enhance building resilience to extreme temperatures?

Options:

A.  

External shading devices

B.  

Tinted skylights

C.  

High-performance glazing

Discussion 0
Question # 112

When a project team sustainably develops a project site, the design should

Options:

A.  

increase water runoff

B.  

maximize construction pollution

C.  

remediate sites already in decline

D.  

replace natural water flow patterns

Discussion 0
Question # 113

Which of the following credit options can a project team attempt if a local, national, or international organization indicates that the neighborhood site of the project has a significant cultural value?

Options:

A.  

Historic district

B.  

Priority designation

C.  

Brownfield remediation

D.  

Diverse uses

Discussion 0
Question # 114

For IPp2: Human Impact Assessment, the team wants to use the ground-floor spaces to achieve both social equity and occupant experience. Which design features would achieve this dual objective?

Options:

A.  

Designing public retail space as a café with seating in an adjacent plaza

B.  

Locating the building 0.25 mi. (0.40 km) from a subway stop and providing secure bicycle storage

C.  

Installing MERV-13 filters in all residential units and using low-VOC paint in the retail spaces

Discussion 0
Question # 115

A new commercial building is being designed to use small capacity air handling units. To meet the requirements of the Carbon Dioxide Monitoring strategy in the Indoor Environmental Quality Credit, Enhanced Indoor Environmental

Quality Strategies, where would CO2 monitors need to be located?

Options:

A.  

In each occupied space

B.  

In each densely occupied space

C.  

In each occupied space and outdoors

D.  

In each occupied space over 500 ft2 (46 m2)

Discussion 0
Question # 116

A project has total waste of 20 tons (18.1 tonnes) that includes the following:

· 8 tons (7.3 tonnes) of recycled demolition steel and concrete

· 2 tons (1.8 tonnes) of trees cleared from the site

. 3 tons (2.7 tonnes) of commingled scrap with 40% diverted

. 6 tons (5.4 tonnes) of used furniture donated to a non-profit organization

· 1 ton (0.9 tonnes) of removed carpet and ceiling tiles sent back to the manufacturer

What is the percentage of diverted waste for Materials and Resources Credit, Construction and Demolition Waste

Management?

Options:

A.  

60%

B.  

75%

C.  

90%

D.  

100%

Discussion 0
Question # 117

Which of these is a method to assess the regional context of a building ' s design for sustainability?

Options:

A.  

Conducting a site analysis

B.  

Consulting with neighbors

C.  

Improving a design threshold

D.  

Performing an energy analysis of the building

Discussion 0
Question # 118

The Required Breathing Zone Outdoor Airflow Vbz for a new banking facility is 0.120 CFM/ft2 (0.6 L/s/m2). If the team decides to attempt Increased Ventilation under Option 2 in the Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, what is the minimum Design Zone Outdoor Airflow?

Options:

A.  

0.144 CFM/ft2 (0.73 (L/s)/m2)

B.  

0.156 CFM/ft2 (0.79 (L/s)/m2)

C.  

0.168 CFM/ft2 (0.85 (L/s)/m2)

D.  

0.30 CFM/ft2 (1.5 (L/s)/m2)

Discussion 0
Question # 119

Which of the following is true regarding LEED Pilot Credits?

Options:

A.  

Pilot Credits are not specific to the rating systems

B.  

Pilot Credits can be attempted in the design review stage only

C.  

A registered Pilot Credit must be replaced on the LEED project ' s scorecard if that pilot credit is removed from the Pilot Credit Library

D.  

Pilot Credit feedback surveys must be completed

Discussion 0
Question # 120

When should a preliminary water budget analysis be conducted?

Options:

A.  

At the time the design development is completed

B.  

At the time the plumbing contractor is selected

C.  

After completion of schematic design

D.  

Before completion of schematic design