Summer Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 65pass65

LEED-AP-BD+C LEED AP Building Design + Construction (LEED AP BD+C) is now Stable and With Pass Result | Test Your Knowledge for Free

Exams4sure Dumps

LEED-AP-BD+C Practice Questions

LEED AP Building Design + Construction (LEED AP BD+C)

Last Update 2 days ago
Total Questions : 404

Dive into our fully updated and stable LEED-AP-BD+C practice test platform, featuring all the latest Leadership in Energy and Environmental Design (LEED) exam questions added this week. Our preparation tool is more than just a USGBC study aid; it's a strategic advantage.

Our free Leadership in Energy and Environmental Design (LEED) practice questions crafted to reflect the domains and difficulty of the actual exam. The detailed rationales explain the 'why' behind each answer, reinforcing key concepts about LEED-AP-BD+C. Use this test to pinpoint which areas you need to focus your study on.

LEED-AP-BD+C PDF

LEED-AP-BD+C PDF (Printable)
$54.25
$154.99

LEED-AP-BD+C Testing Engine

LEED-AP-BD+C PDF (Printable)
$59.5
$169.99

LEED-AP-BD+C PDF + Testing Engine

LEED-AP-BD+C PDF (Printable)
$74.55
$212.99
Question # 111

IPp1: Climate Resilience Assessment identifies a high risk of extreme heat caused by the urban heat-island effect and flooding caused by an impervious site. Which combination identifies an appropriate strategy for heat and sea-level or flooding risks?

Options:

A.  

Heat: High-albedo white roof

Sea level: Emergency backup generators

B.  

Heat: High-efficiency variable refrigerant flow system

Sea level: Green roof

C.  

Heat: Exterior window shading and operable windows

Sea level: Sump pumps with backup power

Discussion 0
Question # 112

A project team has installed a rainwater harvesting system on site. In which of the following could this system be recognized?

Options:

A.  

Water Efficiency Credit, Water Metering and Water Efficiency Prerequisite, Indoor Water Use Reduction

B.  

Water Efficiency Credit, Water Metering and Water Efficiency Prerequisite, Outdoor Water Use Reduction

C.  

Sustainable Sites Credit, Rainwater Management and Water Efficiency Credit, Indoor Water Use Reduction

D.  

Sustainable Sites Credit, Rainwater Management and Water Efficiency Prerequisite, Indoor Water Use Reduction

Discussion 0
Question # 113

The LEED AP is leading the first design charrette for a new LEED project with the project's owners. What document should be used to record the project goals to be used throughout the design of the project?

Options:

A.  

Owner's Project Requirements (OPR)

B.  

Owner's list of wants and needs

C.  

Criteria for contractor selection

D.  

Basis of Design (BOD)

Discussion 0
Question # 114

Every location in the U.S. identifies how many regional credits?

Options:

A.  

Four

B.  

Five

C.  

Six

D.  

Seven

Discussion 0
Question # 115

For Location and Transportation Credit, Access to Quality Transit, a project team preparing timetables and service-level documentation must ensure the materials include

Options:

A.  

verification that a weighted daily average has been used for each qualifying route

B.  

confirmation that functional entries of the project are within 3/4 mi. (1.20 km) of the stop

C.  

verification that a weighted building average has been used for each qualifying functional entry

D.  

confirmation that each qualifying route features paired route service (service in opposite directions)

Discussion 0
Question # 116

A newly constructed school has installed solar thermal systems and wind turbines on site. To achieve the maximum number of Energy and Atmosphere points, which team members must be included?

Options:

A.  

Energy Modeler and Contractor

B.  

Construction Manager and Energy Modeler

C.  

Energy Modeler and Commissioning (Cx) Agent

D.  

Commissioning (Cx) Agent and Facilities Manager

Discussion 0
Question # 117

The WaterSense label or local equivalent requirement in Water Efficiency Prerequisite, Indoor Water Use Reduction ensures that eligible newly installed plumbing fixtures will

Options:

A.  

be advertised as LEED compliant

B.  

be both water efficient and high performing

C.  

comply with mandatory federal government regulations

D.  

comply with all international plumbing system requirements

Discussion 0
Question # 118

Which additional requirement must a project team meet to earn a second point for reducing carbon emissions from construction activities, beyond tracking all fuel and utility usage for contractor jobsite operations?

Options:

A.  

Install a temporary solar-panel system on the construction site to offset emissions

B.  

Track and report all combustion-fuel and energy use for the contractor and all subcontractors

C.  

Submit a life-cycle assessment of all building materials used in the project

Discussion 0
Get LEED-AP-BD+C dumps and pass your exam in 24 hours!

Free Exams Sample Questions